background image

PCN 504819-000

Effective Date:  June 29, 2010

PII 54863
Revision AD

12

A

B

43.  Shrink the wraparound sleeve

Preheat evenly along both sides of the rail/channel area until this 
area begins to shrink.  To achieve uniform heating, move the flame 
back and forth from one side of the channel to the other as shown 
in illustration “A” while moving flame along the entire length of the 
channel as shown in illustration “B” until the sleeve starts to shrink.  
This technique will assure a properly preheated rail and channel area.

Begin shrinking at the center of the sleeve and work toward each 
end.    

Apply heat until the sleeve is fully shrunk and the heat-sensitive 
green paint is completely converted to black.  Continue heating the 
rail/channel area for another 5 seconds per foot.  A white line should 
be visible in the channel gaps indicating sufficient heating.

Note:

  Green heat-sensitive paint will turn black as sleeve shrinks in 

place.
 

This completes the splice.

Note: 

 Allow to cool before moving or placing in service.

Adhesive Flow

(both ends)

White indicator

687

The Information contained in these installation instructions is for use only by installers trained to make electrical power installations and is intended to describe the correct method 
of installation for this product. However, Tyco Electronics Corporation has no control over the field conditions which influence product installation.  It is the user’s responsibility to 
determine the suitability of the installation method in the user’s field conditions. Tyco Electronics’ only obligations are those in Tyco Electronics’ standard Conditions of Sale for this 
product and in no case will Tyco Electronics be liable for any other incidental, indirect or consequential damages arising from the use or misuse of the products.  

TE (logo) and Tyco Electronics are trademarks.  Copyright 1998, 2010 Tyco Electronics Corporation.  All Rights Reserved.  

Содержание HVSA-3-1580S Series

Страница 1: ...tive contaminants on the product Clean burning torches include the Tyco Electronics FH 2629 FH 2649 uses refillable propane cylinders and FH 2618A uses disposable cylinder Adjusting the Torch Adjust r...

Страница 2: ...wire have equivalent cross section to cable metallic shield Additional braid may be needed for LC shield lead sheath cables or if external grounding or shield interrupting is required Raychem HVS EG...

Страница 3: ...res Grounding Conductor s P OL Y 4 102mm 178 4 Prepare lead sheath Abrade the lead sheath and clean with oil free solvent as shown PILC Abrade lead oxide and clean 16 406mm Lead Sheath 653 5 Remove le...

Страница 4: ...nal Width H PILC 105 9 Position OBT shrink in place Place an Oil Barrier Tube OBT over each phase butted to the lead sheath or belt paper cutback Shrink the three OBTs in place starting at the lead sh...

Страница 5: ...203mm HVSA 3 1584S 8 1 2 216mm OBT Insulation I C L PILC 220 14 Clean OBTs Using an approved solvent clean the OBT Insulation as shown OBT Insulation Clean PILC 222 15 Install SRM insert Assemble SRM...

Страница 6: ...he finished SRM diameter should not exceed that of the breakout installed in the next step PILC Stretch SRM to 1 2 Original Width 358 20 Position conductive breakout shrink in place Position the condu...

Страница 7: ...remaining backing strip tightly wrap the SRM around the connector and exposed conductor Be sure to fill the gaps and low spots around the connector Continue to wrap the SRM onto the insulation as sho...

Страница 8: ...tive tube Repeat Steps 25 30 for the remaining two phases Black Stress Control Tube 309 29 Apply Discharge Control Compound DCC Snip open the end of the DCC ampule and apply a thin film of compound ov...

Страница 9: ...ons to these instructions 33 Apply red sealant Remove backing from red sealant Using light tension wrap sealant over the cable butted against the red insulating tube as shown Build the sealant to the...

Страница 10: ...spring clamp over the braid 3 Fold the braid back over the spring clamp wraps Continue to wrap the remaining clamp over the braid Tighten clamp by twisting it in the direction it is wrapped and secur...

Страница 11: ...area and center on the exposed cable armor and lead sheath Bind the ends of the armorwrap to the cable armor and lead sheath with the tape provided Abrade and solvent clean cable jackets as shown to p...

Страница 12: ...eating Note Green heat sensitive paint will turn black as sleeve shrinks in place This completes the splice Note Allow to cool before moving or placing in service Adhesive Flow both ends White indicat...

Отзывы: