28.  Apply SRM at semi-con cutback

Remove backings from the short angle-cut piece of SRM.  Place tip of 
SRM at semi-con step and tightly wrap to fill the step.  Overlap semi-
con and insulation and taper down to meet insulation as shown.

Note: 

 If using UniShield* cable, apply SRM as shown to fill 

conductive jacket step.

1/4"
Insulation Overlap

1/4"
Semi-con Overlap

(5mm)

(5mm)

Stretch SRM to
1/4"             wide

(5mm)

308

*UniShield is a trademark of General Cable Technologies Corporation

30.  Position black stress control tube

Center black stress control tube over the completed connector area.  
Be sure to equally overlap the Poly cable semi-con and the PILC cable 
black conductive tube.  

Repeat Steps 25-30  for the remaining two phases.

Black Stress Control Tube

309

29.  Apply Discharge Control Compound (DCC)

Snip open the end of the DCC ampule and apply a thin film of 
compound over the three applications of SRM.

DCC

DCC

DCC

Apply thin film of DCC over installed SRM

1847

31.  Check position of black stress control tubes; shrink in place

Center the tubes over the splice.  Begin shrinking at the center (1) 
of the tubes, working the torch around all sides of the tubes.  After 
the center portion shrinks, work towards one end (2), then to the 
opposite end (3).

Note:

  Do not point the flame at the cable semi-con.

The rings from the SRM wraps may be visible as the tubing shrinks.

Post heat the connector area until the tube surface is smooth and the 
underlying SRM wraps are no longer visible.

1

2

3

Black Stress Control Tube

Shrink tube until smooth profile

Visible wrap
lines

Center tube over connection area

310

Содержание HVSA-3-1580S Series

Страница 1: ...tive contaminants on the product Clean burning torches include the Tyco Electronics FH 2629 FH 2649 uses refillable propane cylinders and FH 2618A uses disposable cylinder Adjusting the Torch Adjust r...

Страница 2: ...wire have equivalent cross section to cable metallic shield Additional braid may be needed for LC shield lead sheath cables or if external grounding or shield interrupting is required Raychem HVS EG...

Страница 3: ...res Grounding Conductor s P OL Y 4 102mm 178 4 Prepare lead sheath Abrade the lead sheath and clean with oil free solvent as shown PILC Abrade lead oxide and clean 16 406mm Lead Sheath 653 5 Remove le...

Страница 4: ...nal Width H PILC 105 9 Position OBT shrink in place Place an Oil Barrier Tube OBT over each phase butted to the lead sheath or belt paper cutback Shrink the three OBTs in place starting at the lead sh...

Страница 5: ...203mm HVSA 3 1584S 8 1 2 216mm OBT Insulation I C L PILC 220 14 Clean OBTs Using an approved solvent clean the OBT Insulation as shown OBT Insulation Clean PILC 222 15 Install SRM insert Assemble SRM...

Страница 6: ...he finished SRM diameter should not exceed that of the breakout installed in the next step PILC Stretch SRM to 1 2 Original Width 358 20 Position conductive breakout shrink in place Position the condu...

Страница 7: ...remaining backing strip tightly wrap the SRM around the connector and exposed conductor Be sure to fill the gaps and low spots around the connector Continue to wrap the SRM onto the insulation as sho...

Страница 8: ...tive tube Repeat Steps 25 30 for the remaining two phases Black Stress Control Tube 309 29 Apply Discharge Control Compound DCC Snip open the end of the DCC ampule and apply a thin film of compound ov...

Страница 9: ...ons to these instructions 33 Apply red sealant Remove backing from red sealant Using light tension wrap sealant over the cable butted against the red insulating tube as shown Build the sealant to the...

Страница 10: ...spring clamp over the braid 3 Fold the braid back over the spring clamp wraps Continue to wrap the remaining clamp over the braid Tighten clamp by twisting it in the direction it is wrapped and secur...

Страница 11: ...area and center on the exposed cable armor and lead sheath Bind the ends of the armorwrap to the cable armor and lead sheath with the tape provided Abrade and solvent clean cable jackets as shown to p...

Страница 12: ...eating Note Green heat sensitive paint will turn black as sleeve shrinks in place This completes the splice Note Allow to cool before moving or placing in service Adhesive Flow both ends White indicat...

Отзывы: