background image

PCN 504819-000

Effective Date:  June 29, 2010

PII 54863
Revision AD

3

Choice 3

Choice 2

Choice 1

If Drain Wire Shield Cable

Refer to Table 2 and prepare the cables as shown.   Remove any 
fillers to the armor cutback.  Pull drain wires back to Dimension B 
and temporarily tape over ends as shown.  Bend back the grounding 
conductors(s) over the jacket as shown.

Go to Step 4 below.

A2

PILC

A1

C

C

L

B

Tape over ends 
of drain wires

Grounding
Conductor(s)

P

OL

Y

4"

(102mm)

177

If UniShield* Cable

Refer to Table 2 and prepare the cables as shown.  Remove any 
fillers to the armor cutback.  Pull drain wires back to Dimension B 
and temporarily tape over ends as shown.  Bend back the grounding 
conductors(s) over the jacket as shown.

Go to Step 4.

A2

PILC

A1

C

C

L

B

Tape over ends
of drain wires

Grounding
Conductor(s)

P

OL

Y

4"

(102mm)

178

4.  Prepare lead sheath

Abrade the lead sheath and clean with oil-free solvent as shown.

PILC

Abrade lead oxide

and clean

16" 

(406mm)

Lead Sheath

653

5.  Remove lead sheath as shown

   Lead 

Sheath

   Cutback 
Kit 

  G

 

HVSA-3-1581S  

14”  (356mm)

HVSA-3-1582S  

15”  (381mm)

HVSA-3-1583S  

16”  (406mm)

HVSA-3-1584S  

17”  (432mm) 

G

C

L

Lead Sheath

Phase Shield

PILC

101

6.  Cut back shield or belt papers

Choose the cable type (choice 1 or 2) and follow the directions given.

If Shielded PILC Cable 

Cut back any bedding and/or shielding tapes over all three phases 
to lead sheath cutback.  Cut back phase shields and remove any 
conductive material from paper insulation as shown.  

Tack solder metal tape shields to prevent unwrapping and tape over 
sharp edges with one wrap of electrician’s tape.  

Go to Step 7 page 4.

Lead
Sheath

Paper

Insulation

6" 
Phase Shield

(150mm)

PILC

Remove
conductive
material

102

*UniShield is a trademark of General Cable Technologies Corporation

Содержание HVSA-3-1580S Series

Страница 1: ...tive contaminants on the product Clean burning torches include the Tyco Electronics FH 2629 FH 2649 uses refillable propane cylinders and FH 2618A uses disposable cylinder Adjusting the Torch Adjust r...

Страница 2: ...wire have equivalent cross section to cable metallic shield Additional braid may be needed for LC shield lead sheath cables or if external grounding or shield interrupting is required Raychem HVS EG...

Страница 3: ...res Grounding Conductor s P OL Y 4 102mm 178 4 Prepare lead sheath Abrade the lead sheath and clean with oil free solvent as shown PILC Abrade lead oxide and clean 16 406mm Lead Sheath 653 5 Remove le...

Страница 4: ...nal Width H PILC 105 9 Position OBT shrink in place Place an Oil Barrier Tube OBT over each phase butted to the lead sheath or belt paper cutback Shrink the three OBTs in place starting at the lead sh...

Страница 5: ...203mm HVSA 3 1584S 8 1 2 216mm OBT Insulation I C L PILC 220 14 Clean OBTs Using an approved solvent clean the OBT Insulation as shown OBT Insulation Clean PILC 222 15 Install SRM insert Assemble SRM...

Страница 6: ...he finished SRM diameter should not exceed that of the breakout installed in the next step PILC Stretch SRM to 1 2 Original Width 358 20 Position conductive breakout shrink in place Position the condu...

Страница 7: ...remaining backing strip tightly wrap the SRM around the connector and exposed conductor Be sure to fill the gaps and low spots around the connector Continue to wrap the SRM onto the insulation as sho...

Страница 8: ...tive tube Repeat Steps 25 30 for the remaining two phases Black Stress Control Tube 309 29 Apply Discharge Control Compound DCC Snip open the end of the DCC ampule and apply a thin film of compound ov...

Страница 9: ...ons to these instructions 33 Apply red sealant Remove backing from red sealant Using light tension wrap sealant over the cable butted against the red insulating tube as shown Build the sealant to the...

Страница 10: ...spring clamp over the braid 3 Fold the braid back over the spring clamp wraps Continue to wrap the remaining clamp over the braid Tighten clamp by twisting it in the direction it is wrapped and secur...

Страница 11: ...area and center on the exposed cable armor and lead sheath Bind the ends of the armorwrap to the cable armor and lead sheath with the tape provided Abrade and solvent clean cable jackets as shown to p...

Страница 12: ...eating Note Green heat sensitive paint will turn black as sleeve shrinks in place This completes the splice Note Allow to cool before moving or placing in service Adhesive Flow both ends White indicat...

Отзывы: