PCN 504819-000

Effective Date:  June 29, 2010

PII 54863
Revision AD

6

18.  Mark lead sheath as shown

Note:

  To ensure SRM to OBT adhesion, gently heat the SRM insert 

and adjacent OBT before moving on to the next step.

PILC

1-1/2"  

(40mm)

Lead Sheath

357

19.  Install oil seal

Remove backing from one side of a long strip  of SRM.  Roll the SRM 
and remaining backing strip into a convenient size.  Removing the 
remaining backing strip, tightly wrap the SRM from the mark on the 
lead sheath to the outer edge of the SRM insert.  Four to six strips of 
SRM should be used to build the SRM to the shape shown.

Note:

  Do not over apply.  The finished SRM diameter should not 

exceed that of the breakout installed in the next step.

PILC

Stretch SRM to
1/2 Original Width

358

20.  Position conductive breakout; shrink in place

Position the conductive breakout over the SRM so that the inside 
butts up hard against the SRM.

Shrink in place starting at the fingers and working toward the other 
end.

Conductive

Breakout

PILC

359

21.  Inspect breakout

After the breakout has shrunk, continue to apply heat until the 
breakout has a smooth, uniform surface. 

PILC

360

22.  Clean cables; position splice components

Abrade insulation, if necessary, to remove imbedded semi-con.  
Clean Poly cable jackets for 30” (760mm).

Place one set of nested tubes over each clean Poly cable.

Black Reinforcing Tube

Black Stress Control Tube

Black/Red Dual Layer Tube

Red Insulating Tube

208

Содержание HVSA-3-1580S Series

Страница 1: ...tive contaminants on the product Clean burning torches include the Tyco Electronics FH 2629 FH 2649 uses refillable propane cylinders and FH 2618A uses disposable cylinder Adjusting the Torch Adjust r...

Страница 2: ...wire have equivalent cross section to cable metallic shield Additional braid may be needed for LC shield lead sheath cables or if external grounding or shield interrupting is required Raychem HVS EG...

Страница 3: ...res Grounding Conductor s P OL Y 4 102mm 178 4 Prepare lead sheath Abrade the lead sheath and clean with oil free solvent as shown PILC Abrade lead oxide and clean 16 406mm Lead Sheath 653 5 Remove le...

Страница 4: ...nal Width H PILC 105 9 Position OBT shrink in place Place an Oil Barrier Tube OBT over each phase butted to the lead sheath or belt paper cutback Shrink the three OBTs in place starting at the lead sh...

Страница 5: ...203mm HVSA 3 1584S 8 1 2 216mm OBT Insulation I C L PILC 220 14 Clean OBTs Using an approved solvent clean the OBT Insulation as shown OBT Insulation Clean PILC 222 15 Install SRM insert Assemble SRM...

Страница 6: ...he finished SRM diameter should not exceed that of the breakout installed in the next step PILC Stretch SRM to 1 2 Original Width 358 20 Position conductive breakout shrink in place Position the condu...

Страница 7: ...remaining backing strip tightly wrap the SRM around the connector and exposed conductor Be sure to fill the gaps and low spots around the connector Continue to wrap the SRM onto the insulation as sho...

Страница 8: ...tive tube Repeat Steps 25 30 for the remaining two phases Black Stress Control Tube 309 29 Apply Discharge Control Compound DCC Snip open the end of the DCC ampule and apply a thin film of compound ov...

Страница 9: ...ons to these instructions 33 Apply red sealant Remove backing from red sealant Using light tension wrap sealant over the cable butted against the red insulating tube as shown Build the sealant to the...

Страница 10: ...spring clamp over the braid 3 Fold the braid back over the spring clamp wraps Continue to wrap the remaining clamp over the braid Tighten clamp by twisting it in the direction it is wrapped and secur...

Страница 11: ...area and center on the exposed cable armor and lead sheath Bind the ends of the armorwrap to the cable armor and lead sheath with the tape provided Abrade and solvent clean cable jackets as shown to p...

Страница 12: ...eating Note Green heat sensitive paint will turn black as sleeve shrinks in place This completes the splice Note Allow to cool before moving or placing in service Adhesive Flow both ends White indicat...

Отзывы: