PCN 504819-000
Effective Date: June 29, 2010
PII 54863
Revision AD
6
18. Mark lead sheath as shown
Note:
To ensure SRM to OBT adhesion, gently heat the SRM insert
and adjacent OBT before moving on to the next step.
PILC
1-1/2"
(40mm)
Lead Sheath
357
19. Install oil seal
Remove backing from one side of a long strip of SRM. Roll the SRM
and remaining backing strip into a convenient size. Removing the
remaining backing strip, tightly wrap the SRM from the mark on the
lead sheath to the outer edge of the SRM insert. Four to six strips of
SRM should be used to build the SRM to the shape shown.
Note:
Do not over apply. The finished SRM diameter should not
exceed that of the breakout installed in the next step.
PILC
Stretch SRM to
1/2 Original Width
358
20. Position conductive breakout; shrink in place
Position the conductive breakout over the SRM so that the inside
butts up hard against the SRM.
Shrink in place starting at the fingers and working toward the other
end.
Conductive
Breakout
PILC
359
21. Inspect breakout
After the breakout has shrunk, continue to apply heat until the
breakout has a smooth, uniform surface.
PILC
360
22. Clean cables; position splice components
Abrade insulation, if necessary, to remove imbedded semi-con.
Clean Poly cable jackets for 30” (760mm).
Place one set of nested tubes over each clean Poly cable.
Black Reinforcing Tube
Black Stress Control Tube
Black/Red Dual Layer Tube
Red Insulating Tube