4.11 Recharging the accumulator
WARNING
Recharging must be done according to local
safety regulations for working with pressure
vessels.
4.11.1 Establish a filling line between the gas
pressure valve and a gas tank.
The accumulator charging kit contains a
pressure gauge and a filling line.
Remember that the adaptor from the line
and to the gas tank is country specific and
may need to be sourced separately.
4.11.2 Open the gas tank valve and the top valve to
fill the accumulator.
Close gas tank valve and wait several
minutes for the new gas to equalize to the
accumulator temperature.
Measure the gas pressure.
If the pressure is too low apply more gas.
4.11.3 If the gas pressure is too high open the side
valve to relieve gas.
Close the top valve when the gas pressure
is correct.
4.11.4 Open the side valve, relieve the pressure
completely and remove the gas pressure
gauge.
4.11.5 Tighten the plug (18 - 22Nm) using the 6mm
Allen key (hexagonal) and mount the
threaded end cap by hand.
FIGURE 4.19
FIGURE 4.15
FIGURE 4.16
FIGURE 4.17
FIGURE 4.18
Transmisiones FU Ibérica, S.L.
C/ África 17 · Polígono Industrial Can Mora · 08459 - Sant Antoni de Vilamajor · Barcelona · SPAIN
+34 93 268 18 33
fuiberica
@
fuiberica.com
www.fuiberica.com