![twall Premium64 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/twall/premium64/premium64_user-manual_1183788018.webp)
t
wall
®
Premium64
standard Color mobile / stationary User manual | Rev. 1.0.3
18 |E
3.2
Stationary installation of
the
t
wall
®
Premium64
3.2.1
Storage space requirements
The wall the device will be assembled to
must have a sufficient solidity and should be
suitable to use the provided dowels. Plaster-
board walls have to be covered at least twice.
The safe fastening of the device should be
checked on a regular basis
(fig. 3.2-1 and
3.2-2)
.
In order to assemble the
t
wall
®
, you will
require at least 2 individuals and the following
tools:
Allen keys (included in scope of delivery)
Stepladder
Spirit level
Measuring tape
Hammer drill
Drill bit (size 12 mm | 0.47 inch)
Wrench (size 17 mm | 0.67 inch)
3.2.2
Assembly instructions
3.2.2.1 Assembling the aluminium frame
I. Mounting the frame profiles::
Step
1
Please remove the packaging
material. You can use it as a pad during the
assembly to avoid that the components are
scratched or damaged.
Step
2
Before you start putting together
the aluminium frame
A2
(fig. 3.2-3)
please
attach the eight (8) profile connectors to the
provided positions at the long frame profiles
A2c
first.
In order to fasten the profile connectors, the
chamfering should point towards the cross
piece which is indicated by the mark at the
anchor (3.1-2, assembly principle of the profile
connectors). The set screw will be slightly
screwed into the cross piece with the corres-
ponding Allen key. The anchor will be drawn
into the profile automatically.
It is important that you can still see the neck
of the anchor
(fig. 3.2-4)
to be able to insert
it into the lead channels at a later point. It
might be the case that you need to push the
anchor slightly against the cross piece while
screwing it in.
PLEASE NOTE: In order to assemble the aluminium frame, place the construction on the floor. The side the
basic modules will be mounted to at a later point (side of the training area) should face the floor. Therefo-
re, the cross pieces of the profile connectors should point upwards.
fig. 3.2-1
3m
training area
Gestellfuß
t
wall
®
fig. 3.2-3
fig. 3.2-2
user's view
fig. 3.2-4
anchor neck
mark on
the anchor
marks on
the cross piece
Содержание Premium64
Страница 2: ......
Страница 40: ...509 160822...