STEP 4
(Locating Power Unit)
1. Select a site for the Power Unit so that operators
have a full unobstructed view of the lift.
2. It is recommended that the Hydraulic Hose and Air
Safety Line for the lift be routed through the floor at
the base of the Power Unit, so check for routing
clearances.
3. Using the Power Unit Stand as a template, mark the
locations of the two anchor bolt holes.
4. Drill two holes 3/4” x 4” deep in concrete floor.
5. Remove all dust from hole.
6. Install Anchors as shown below. (See Fig. 4.2)
7. Secure Power Unit Stand to the floor using two
3/4” anchor bolts supplied.
8. Attach Power Unit to Stand using four 5/16” hex
bolts and nylon nuts supplied. NOTE: Motor must
be at least 18” above floor.
9. Install the Air Safety Valve “Z ”bracket on the
upper left mounting hole of the Power Unit Stand.
STEP 5
(Flow Divider / Hydraulic Hose Installation)
1. Secure the Hydraulic Flow Divider to a permanent
wall or fixture (usually below grade) in an area that
will allow the Power Hoses (the two hoses that are
installed at the lift Cylinders) to be equal length.
(See Fig 5.1)
It may be necessary to add hose extensions to
accommodate installation. If so, keep the power hoses
as close to equal length as possible to provide equal
pressure and lifting.
Содержание PL6K
Страница 1: ...PL6K 6600 POUND CAPACITY LOW RISE PIT Installation and Operation Manual REV A 062813 ...
Страница 2: ......
Страница 3: ......
Страница 25: ...25 6600Lbs 3000Kg 3300Lbs 1500Kg 3300Lbs 1500Kg ...
Страница 26: ...26 ...
Страница 34: ...34 MAINTENANCE RECORDS ...
Страница 35: ...35 ...