10
TOOLS REQUIRED
Rotary Hammer Drill Or Similar
3/4” ; 1 1/4” Masonry Bits
Hammer
4 Foot Level
Open-End Wrench Set: 1/2””,15/16” - 1-1/8”
Socket And Ratchet Set: 1-1/8”
Medium Crescent Wrench
Crow Bar
Chalk Line
Medium Flat Screwdriver
Tape Measure: 25 Foot Suggested
NOTE:
An air supply (30 PSI Min / 3 CFM Min.) will be required for the safety-lock mechanisms. See Step 11.
IMPORTANT NOTICE!
These instructions must be followed to insure proper installation and operation of your lift.
Failure to comply with these instructions can result in serious bodily harm and void product warranty.
Manufacturer will assume no liability for loss or damage of any kind, expressed or implied resulting
from improper installation or use of this product.
PLEASE READ ENTIRE MANUAL PRIOR TO INSTALLATION!
STEP 1
(Selecting Site)
Before installing your new lift, check the following.
1.
LIFT LOCATION
: Always use architects plans when
available. Check layout dimension against floor plan
requirements making sure that adequate space is
available.
2.
OVERHEAD OBSTRUCTIONS
: The area where the lift
will be located should be free of overhead obstructions
such as heaters, building supports, electrical lines etc.
3.
DEFECTIVE FLOOR
: Visually inspect the site where
the lift is to be installed and check for cracked or
defective concrete.
4.
OPERATING TEMPERATURE.
Operate lift only
between temperatures of 5° -40°C (41° -104° F.)
5.
Lift is designed for
INDOOR INSTALLATION ONLY.
STEP 2
(Floor Requirements)
This lift must be installed on a solid level concrete floor with
no more than 3-degrees of slope. Failure to do so could
cause personal injury or death.
A level floor is suggested for proper use and installation
and level lifting. If a floor is of questionable slope,
consider a survey of the site and/or the possibility of
pouring a new level concrete slab.
DO NOT
install or use this lift on any asphalt
surface or any surface other than concrete.
DO NOT
install or use this lift on expansion seams
or on cracked or defective concrete.
DO NOT
install or use this lift on a second/elevated
floor without first consulting building architect.
DO NOT
install or use this lift outdoors.
CONCRETE SPECIFICATIONS
The min. thickness of the concrete is 4” for this lift.
DANGER
This lift MUST be installed on 3000PSI concrete only
conforming to the minimum requirements shown above.
New concrete must be adequately cured by at least
28 days minimum.
!
IMPORTANT NOTE:
This lift is supplied with installation instructions and concrete fasteners meeting the criteria as prescribed by the
American National Standard "Automotive Lifts - Safety Requirements for Construction, Testing, and Validation"
ANSI/ALI ALCTV-2006. Lift buyers are responsible for any special regional structural and/or seismic anchoring
requirements specified by any other agencies and/or codes such as the Uniform Building Code (UBC)and/or
International Building Code (IBC).
CAUTION!
Содержание PL6K
Страница 1: ...PL6K 6600 POUND CAPACITY LOW RISE PIT Installation and Operation Manual REV A 062813 ...
Страница 2: ......
Страница 3: ......
Страница 25: ...25 6600Lbs 3000Kg 3300Lbs 1500Kg 3300Lbs 1500Kg ...
Страница 26: ...26 ...
Страница 34: ...34 MAINTENANCE RECORDS ...
Страница 35: ...35 ...