16
2. Install the 90 Degree Hydraulic Fitting in the pressure
port of the Power Unit. The pressure port is covered
with a plastic plug. Use teflon tape on pipe fittings
ONLY.
3. After the fitting is installed correctly, connect the 140”
Hydraulic Hose making sure to not over-tighten.
(For below grade hose installations a 1-1/4” hole should
be drilled through the floor at the base of the Power
Unit so the hose can be routed below grade.)
4. Connect the other end of the Power Unit Hose to the
fitting marked “IN” on the Flow Divider. (See Fig 5.1)
5. Connect the two remaining equal length Hoses to
the Flow Divider. (See Fig 5.1)
3/8” I.D. hydraulic tubing / hose may be used rather
than the hose provided as long as it is rated for 3,000
PSI operating pressure with a 12,000 PSI burst.
STEP 6
(Power Unit Installation)
1. Have a certified electrician run the power supply to
motor. Refer to the data plate found on the motor
for proper power supply and wire size.
NOTE
: The standard power unit can be run on either
110V or 220V. It is already wired for 110V and
equipped with a 3-wire power cord with grounding
plug. For optional 220V hook up, follow the wiring
instructions as shown on the motor data plate. See
electrical data below.
Line Voltage
Running Amps
Circuit Breaker
110/115V
11.6
25A
208V
6.4
30A
230V
5.8
30A
Содержание PL6K
Страница 1: ...PL6K 6600 POUND CAPACITY LOW RISE PIT Installation and Operation Manual REV A 062813 ...
Страница 2: ......
Страница 3: ......
Страница 25: ...25 6600Lbs 3000Kg 3300Lbs 1500Kg 3300Lbs 1500Kg ...
Страница 26: ...26 ...
Страница 34: ...34 MAINTENANCE RECORDS ...
Страница 35: ...35 ...