10
FP8K-B / FP8K-DX / FP8K-DX-XLT
Jun 2017-A
14.
Stand up and arrange the two end structures (Columns & Crossbeams) so that the outside of
the Crossbeam rail to the outside of the other Crossbeam rail
‘diagonal’ measurements are
close. Compare the measurements from the left and the right until they are diagonally within
1/2
”.
Note: The ½” variance will help in mounting the Runways later.
15. Carefully lift and position each Runway into place and secure to Crossbeams ends with the
provided Hex Bolts (#44), Mounting Plate (#42) and hardware (#19, 45, 46 & 47) as shown in
Fig. 5 & 5b. The lift will square itself as you further assemble it.
Note: Ensure to install the ‘offside’ Sub Runway opposite from the Main side Runway and
Power unit Column, as shown in Fig.5b.
Fig. 5 Fig. 5b
Column
Crossbeam
End Structures
Mounting Plate
Sub Runway
Mainside
Runway
Содержание FP8K-B
Страница 23: ...23 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 1...
Страница 24: ...24 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 2...
Страница 25: ...25 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 3...
Страница 26: ...26 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 4 41...
Страница 27: ...27 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 5...