9
FP8K-B / FP8K-DX / FP8K-DX-XLT
Jun 2017-A
10. If you have means for securely lifting the
Crossbeam, lower it into the tops of the
Columns. If not, the Columns will have to be
placed horizontally, in order to install the
Crossbeams into the Columns. Then, the
entire end structure (two columns and
crossbeam) will need to be stood up as one.
11. Unpack the Lock Ladders (Fig. 4) from the
package and slide them into the precut slot on
the Rub Blocks (#56) inside each column. After
removing the top Nut from the Lock Ladder,
you are ready to install the Top Caps A & B
(#3 & #4) on the columns.
12. Be aware of the offset hole in column
’s Top
Caps. Arrange Top Caps so that the cable
mounting holes are closest to the runways.
Use provided Bolts, Nuts, Washers and Lock
Washers to install Top Caps, as shown in Fig.
4 & 4b.
Fig. 4b
13. Secure Top Cap and Lock Ladder assemblies
together with Washer and Nut as shown in Fig
4b.
Note: Ensure Jam Nut is positioned
below Top Caps
. Position the Crossbeams at
the second lowest locking position on all columns
Fig. 4
Cable mount
hole
Top Cap
Lock Ladder
Содержание FP8K-B
Страница 23: ...23 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 1...
Страница 24: ...24 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 2...
Страница 25: ...25 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 3...
Страница 26: ...26 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 4 41...
Страница 27: ...27 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 5...