19
FP8K-B / FP8K-DX / FP8K-DX-XLT
Jun 2017-A
PREVENTIVE MAINTENANCE SCHEDULE
The periodic Preventive Maintenance Schedule given is the suggested minimum requirements & minimum
intervals; accumulated hours or monthly period, whichever comes sooner.
Periodic maintenance is to be performed on a daily, weekly, and yearly basis as given in the following
paragraphs.
Do not modify the lift in any manner without the prior written consent of the manufacturer.
WARNING!! Failure to perform the daily pre-operational check can result in expensive property
damage, lost production time, serious personal injury, and even death. The safety latch system must
be checked and working properly before the lift is put to use.
Failure to heed this warning can result in death or serious injury, or damage to equipment. If you hear a noise
not associated with normal lift operation or if there is any indications of impending lift failure CEASE
OPERATION IMMEDIATELY! Inspect, correct and/or replace parts as required.
Daily Pre-Operation Check (8-Hours)
Ø
Check safety lock audibly and visually while in operation
Ø
Check safety latches for free movement and full engagement with rack.
Ø
Check hydraulic connections, and hoses for leakage.
Ø
Check cables connections for bends, cracks and proper tension.
Ø
Check for frayed cables in both raised and lowered position.
Ø
Check snap rings at all rollers and sheaves.
Ø
Check bolts, nuts, and screws and tighten if needed.
Ø
Check wiring & switches for damage.
Ø
Check floor for stress cracks near columns.
Ø
Check lubrication on cable sheaves and shafts.
Weekly Maintenance (every 40-Hours)
Ø
IF LIFT IS ANCHORED TO FLOOR - Check anchor bolts torque to 130 ft-lbs for the ¾ in. anchor bolts.
Do not use an impact wrench to tighten anchor bolts.
Ø
Check floor for stress cracks near columns
Ø
Check hydraulic oil level.
Ø
Check and tighten bolts, nuts, and screws.
Ø
Check all cable sheaves/assembly for free movement or excessive wear on cable sheave shaft.
Yearly Maintenance
Ø
Lubricate the cable sheave shafts at least once a year, after the lift is in service.
Ø
Check for excessive wear of cable. Replace them if necessary.
Ø
Change the hydraulic fluid - operating temperature, type of service, contamination levels, filtration, and
chemical composition of fluid should be considered. If operating in dusty environment shorter interval
may be required.
Содержание FP8K-B
Страница 23: ...23 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 1...
Страница 24: ...24 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 2...
Страница 25: ...25 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 3...
Страница 26: ...26 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 4 41...
Страница 27: ...27 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 5...