31
Operative Instructions
Phase 7
16) At the end of the rinse phase, the water is
automatically discharged.
Fig. 18.17
Phase 8
17) Self-loading of deionized water. During the self-
loading phase the chamber will be filled.
Fig. 18.18
18) Rinse phase begins: the machine will rinse the
instruments while checking the conductivity of the
water. At the end of the phase, if the conductivity
will be below a presetted value, the machine will
procede to the next phase. If the check is negative,
the machine will repeat phases 7 and 8 again. If the
second check will fail, the machine will show an
error and stop the cycle.
Fig. 18.19
19) Disinfection phase begins: the machine will rise the
water temperature to 194°F (90°C) and will keep it
for 5 minutes.
Fig. 18.20
Phase 9
20) At the end of the disinfection phase, the water is
automatically discharged.
Fig. 18.21
Содержание TIVA8-MD
Страница 56: ...56 Operative Instructions Notes...
Страница 57: ...57 Operative Instructions Notes...
Страница 58: ...58 Operative Instructions Notes...
Страница 59: ...59 Operative Instructions...