WWW.TUCKERAUTO-MATION.COM
INSTALLATION
GUIDE
KP
evo
- TAP CONTROLLER
920.1003.02 | 19
0 9
1 0
1 1
1
2
T
U
P
.
4
TING INTO SERVICE
4.1 FINAL CHECKS
1. For doors in “
low energy
” mode, make sure that the forces generated by the leaf are within the limits
permitted by the regulations. Use an impact force tester in accordance with standards EN 12453: 2002
and EN 12445: 2002. For non-EU countries, of there are no specific local regulations, the force must be less
than 67 N.
2. For doors that are not in “
low energy
” mode, make sure that the test object is detected in all areas covered
by the leaf movement.
4.2 FINAL OPERATIONS
1. Connect the cable of the functions selector at the side of the unit to the
I/O
board (connector J2).
2. Install the front cover.
3. Highlight all areas with adequate warning signs in which there are still residual risks, even if all possible
safety measures having been adopted. In particular, for doors less than 2 meters high, apply the hazard
warning pictograms in correspondence with the arm movement area.
4. Place a “DANGER, AUTOMATICALLY CONTROLLED” sign in a prominent position on the door.
5. Attach the CE marking on the door.
6. Fill out the EC declaration of conformity and the system register.
7. Give the EC Declaration, the system register with the maintenance plan and the instructions for use of the
automation to the system owner/operator.
INSTALLING A PLASTIC COVER
1. Install the cover fixing plates with screws
0 9
-1
on both sides.
2. Partially tighten the screws
0 9
-2.
3. Insert the cover so that the screws fit into the slots,
then tighten them.
4. As an alternative to fixing it from the side, use the
template to fasten the cover with screws from the
top or bottom (
1 0
5. Press the top and bottom slot covers on (
1 1
).
Содержание SW10
Страница 13: ...920 1020 15 13 PUSH I O BOARD IS TOWARDS THE HINGE JAMB ...
Страница 30: ...920 1020 15 30 SIMULTANEOUS PAIRS ...