WWW.TUCKERAUTO-MATION.COM
INSTALLATION
GUIDE
KP
evo
- TAP CONTROLLER
920.1003.02 | 20
1 2
1
1
CR1216
1 3
5. MAINTENANCE
5.1 INSERTING / REPLACING THE
BATTERY
CARRY OUT THE FOLLOWING OPERATIONS WITH THE
ELECTRICITY SUPPLY DISCONNECTED
1. Remove the cover.
2. Install or replace the CR1216 battery on the
Logic
board, as shown in
1 3
.
3. Reinstall the cover.
5.2 REPLACING THE FUSE
CARRY OUT THE FOLLOWING OPERATIONS WITH THE
ELECTRICITY SUPPLY DISCONNECTED
There is a power supply protection fuse on the
I/O
board.
To replace it:
1. Remove the cover:
2. Replace the following fuses
-
F 4A for the 230 V version
-
T 3.15A for the 115 V version
3. Reinstall the cover.
INSTALLING AN ALUMINIUM COVER
1. Install the side profiles using the screws
1 2
-1
on both sides.
2. Press the aluminium cover on, aligning the slot
with the side on which the transmission arm has
been installed.
RISKS
PERSONAL PROTECTIVE EQUIPMENT
Always shut off the power supply before performing
any maintenance operations. If the disconnect
switch is not in view, apply a warning sign stating
“WARNING - Maintenance in Progress”. Restore the
power supply only after finishing any maintenance
work and restoring the area to normal.
Maintenance must be performed by the installer or a
maintenance technician.
Follow all safety recommendations and instructions
given in this manual.
Mark off the work site and prohibit access/transit. Do
not leave the work site unattended.
The work area must be kept tidy and cleared after
maintenance has been completed.
Before starting work, wait for any hot components
to cool down.
Do not make any modifications to the original
components.
FAAC S.p.A. shall bear no liability for damage or
injury due to components that have been modified
or otherwise tampered with.
The warranty shall be forfeited in the event of
tampering with components. Only use original
FAAC spare parts.
Содержание SW10
Страница 13: ...920 1020 15 13 PUSH I O BOARD IS TOWARDS THE HINGE JAMB ...
Страница 30: ...920 1020 15 30 SIMULTANEOUS PAIRS ...