Coupling and uncoupling the sweeper
4-25
4.2.1
Three-point linkage - "front mounting"
•
The safety regulations from chapter 4.2 apply.
•
Undertake work on the sweeper only with engine switched off and after
depressurising the hydraulics. Remove the ignition key, secure carrier
vehicle against inadvertent starting up or rolling.
•
Check three-point hitch for contamination and clean if necessary.
•
Move carrier vehicle up to 300 mm
distance to the Sweeper PLUS 560
3
•
Insert pin diameter (1) or (2)
according to the trailer load
2
category of the vehicle
manufacturer and secure with
1
spring cotter pin (3).
➔
Fit upper link and secure
according to the
manufacturer’s instructions.
The adjustment of the
upper link must be
undertaken so that the
sweeper attachment unit is
vertical to the ground.
1
2
Fig. 4.2
•
Pull out cotter pin (4) and locking
bolt (5), then pull the parking stand
(6) upwards and secure it again via
the bottom hole.
•
Connect hydraulic hoses according
to the instructions of the vehicle
manufacturer.
6
•
Connect electrical cables for water-
spray system or lighting to the
switch box inside the carrier
vehicle.
•
Raise sweeper and carry out a
function test.
4
5
Fig. 4.3
Содержание PLUS 560
Страница 2: ......
Страница 12: ...General 1 6 ...
Страница 60: ...Cleaning servicing and maintenance 6 54 Fig 6 12 ...
Страница 67: ...7 61 7 2 Notes Appendix ...
Страница 68: ...Appendix 7 62 ...
Страница 69: ...Plus Sweeper Parts Catalogue 8 Parts Catalogue 8 63 ...