background image

IVORY 4 electric shower

26

Triton Showers 

Triton Road 

Nuneaton 

Warwickshire  CV11 4NR

Triton is a division of Norcros Group (Holdings) Limited

TRITON reserve the right to change product specification without prior notice. E&OE. © TRITON SHOWERS 2013

Customer Service: 

0844 980 0750

Trade Installer Hotline: 

0844 980 0730 

Fax: 

 

0844 980 0744

www.tritonshowers.co.uk 

E-mail: [email protected]

Extended Warranty AVAILABLE NOW. Call 0844 980 0740 for more details.

TRITON STANDARD GUARANTEE

With the exception of accessories, Triton guarantee the 
product against all manufacturing defects for a period of  

2 years

 (for domestic use only) from the date of purchase, 

provided that it has been installed by a competent person in 
full accordance with the fitting instructions. 
All accessories such as shower heads, hoses and riser rails 
carry a 

1 year

 parts only guarantee against manufacturing 

defects.
Any part found to be defective during this guarantee period 
we undertake to repair or replace at our option without 
charge so long as it has been properly maintained and 
operated in accordance with the operating instructions, and 
has not been subject to misuse or damage. This product 
must not be taken apart, modified or repaired except by a 
person authorised by Triton. This guarantee applies only to 
products installed within the United Kingdom and does not 
apply to products used commercially. This guarantee does 
not affect your statutory rights.

What is not covered:
1. 

Breakdown due to: 

a)

 use other than domestic use by 

you or your resident family; 

b)

 wilful act or neglect; 

c)

 any malfunction resulting from the incorrect use or 

quality of electricity, gas or water or incorrect setting 
of controls; 

d)

 failure to install in accordance with this 

installation guide

2. 

Claims for missing parts once the product has been 
installed.

3

.  Repair costs for damage caused by foreign objects or 

substances.

4

.  Total loss of the product due to non-availability of parts.

5

.  Compensation for loss of use of the product or 

consequential loss of any kind.

6

.  Call out charges where no fault has been found with the 

appliance.

7

.  The cost of repair or replacement of pressure relief 

devices, showerheads, hoses, riser rails and/or wall 
brackets, isolating switches, electrical cable, fuses and/or 
circuit breakers or any other accessories installed at the 
same time.

8. 

The cost of routine maintenance, adjustments, overhaul 
modifications or loss or damage arising therefrom, 
including the cost of repairing damage, breakdown, 
malfunction caused by corrosion, furring,

9

.  Call out charges where the water supply cannot be 

isolated, this includes consequential losses arising from 
unserviceable supply valves.

4-12-2012 - 2 yr elec

UK SERVICE POLICY

In the event of a product fault or complaint occurring, the following 

procedure should be followed:

1. 

Telephone Customer Service on 

0844 980 0750

 having available, 

your details including post code, the model number and power 

rating of the product, together with the date of purchase and, where 

applicable, details of the particular fault.

2. 

If required, the Customer Service Advisor will arrange  

for a qualified engineer to call.

3.

  All products attended to by a Triton service engineer must be installed 

in full accordance with the Triton installation guide applicable to the 

product. 

(Every product pack contains an installation guide, however, 

they can also be bought via our Customer Service Spares Department)

.

4.

  Our engineer will require local parking and if a permit is required this 

must be available to the engineer on arrival at the call. 

5.

  It is essential that you or an appointed representative 

(who must 

be over 18 years of age)

 is present for the duration of the service 

engineer's visit. If the product is in guarantee you must produce proof 

of purchase.

6.

  Where a call under the terms of guarantee has been booked and 

the failure is not product related 

(i.e. scaling and furring, incorrect 

water pressure, pressure relief device operation or electrical/plumbing 

installation fault)

 a charge will be made. A charge will also be issued 

if nobody is at home when the service engineer calls or adequate 

parking/permit is not available.

7.

  If the product is no longer covered by the guarantee an up front fixed 

fee will be charged before the site visit.

8.

  Should proof of purchase not be available on an “in-guarantee” call, 

or should the service engineer find that the product is no longer 

under guarantee, the engineer will charge the same fixed price and 

the customer will be expected to pay the engineer before he leaves. 

If payment is not made on the day an administration charge will be 

added to the fixed charge.

9.

  If a debt is outstanding from a previous visit, or from any other Triton 

purchase, Triton reserves the right to withhold service until the debt 

has been settled.

10.

  Triton takes the health, safety and wellbeing of its employees very 

seriously and expects customers to treat all staff members with respect. 

Should any employee feel threatened or receive abuse, either verbally 

or physically, Triton reserves the right to withhold service and will 

support the employee with a legal prosecution.

Replacement Parts Policy

Availability:

 It is the policy of the manufacturer to maintain parts 

availability for the duration of production and a period of five years 

thereafter, in accordance with industry standards.
Spare parts are available via our website, www.tritonshowers.co.uk, 

or by telephoning Triton Customer Service Spares Department. 

Payment should be made by credit/debit card (excluding American 

Express or Diners Card). Payment can also be made by pre-payment 

of a pro forma invoice by cheque or money order. 
Telephone orders are based on information given during of the call. 

Before contacting Triton, please verify your requirements 

using the information contained in the supplied user guide. 

Triton cannot accept liability for incorrect part identification.

For the latest Terms & Conditions, please see: 

www.tritonshowers.co.uk

Содержание IVORY 4

Страница 1: ...Installers please note these instructions are to be left with the user 2180775H April 2012 Installation and operating instructions IVORY 4 electric shower...

Страница 2: ...ing connections 11 Electrical connections 12 Replacing the cover 12 13 Commissioning 14 Operating the shower 15 16 Operating functions 17 Cleaning 17 Instructions for installers and service engineers...

Страница 3: ...and could also cause the PRD Pressure Relief Device in the unit to operate 1 9 This product is not suitable for mounting into steam rooms or steam cubicles 2 PLUMBING 2 1 The plumbing installation mus...

Страница 4: ...rate at a constant rate at your chosen power setting It is the rate of the water passing through the heater can which determines the water temperature The slower the flow the hotter the water becomes...

Страница 5: ...ising valve 6 Solenoid valve 7 Can and element assembly 8 Thermal cut out TCO 9 Earth connection 10 Outlet pipe 11 Start Stop micro switch Pressure relief device see page 20 Cover fig 2 12 Ivory 4 fro...

Страница 6: ...bt switch off the whole installation at the mains supply and remove the correct fuse 3 The shower must be connected to its own independent electrical circuit IT MUST NOT be connected to a ring main sp...

Страница 7: ...dy while standing in a bath or shower cubicle It should be readily accessible to switch off after using the shower 7 Where shower cubicles are located in any rooms other than bathrooms all socket outl...

Страница 8: ...es per minute the inlet of the shower for full performance for 7 5Kw 8 5Kw 9 5Kw Minimum running pressure and flow to 150kPa 1 5 bar at 11 litres per minute the inlet of the shower for full performanc...

Страница 9: ...showerhead be constrained by a fixed or sliding attachment so that it can only discharge water at a point not less than 25mm above the spill over level of the relevant bath shower tray or other fixed...

Страница 10: ...t to remove them Lift the cover from the backplate Entry Points Water Left Bottom Back and Top Right Bottom Back Cable Left Bottom Back and Top The water inlet fig 7 has been designed to allow left or...

Страница 11: ...ide if top or bottom pipe entry is required Once chosen carefully remove the appropriate cut out using a junior hacksaw and file Please note NONE of the cut outs are designed as snap out entry points...

Страница 12: ...the backplate are shown in fig 10 Drill and plug the wall An appropriate drill bit should be used If the wall is brick plasterboard or a soft building block appropriate wall plugs and screws should b...

Страница 13: ...the shower flush out the pipework to remove all swarf and system debris This can be achieved by connecting a hose to the pipework and turning on the mains water supply long enough to clear the debris...

Страница 14: ...ply cable must be secured either by rout ing through conduit or in trunking or by embed ding in the wall in accordance with current IEE regulations The use of connections within the unit to supply pow...

Страница 15: ...turn the stabi liser valve spindle fully clockwise until resistance is felt fig 14 4 With the cover off the shower turn the tem perature control so that it goes to Maximum HOT fig 16 c Make sure the...

Страница 16: ...he control to MINIMUM FLOW may cause the PRD to operate 2 Turn on the electric and mains water supplies to the shower 3 Turn the power selector to the COLD setting fig 18 and wait until water starts t...

Страница 17: ...ot be met due to low water pressure it will be necessary to operate the unit on this setting during the warmer months because of flow rate limitations entering the unit The symbol is a high power sett...

Страница 18: ...s advisable to be certain that the showering temperature is satisfactory by testing with your hand before stepping under the showerhead There will always be a time delay of a few seconds between selec...

Страница 19: ...will disconnect the heating elements It will require a visit from a qualified engineer to determine the nature of the fault and replace the safety device once the unit has been repaired TP Temperatur...

Страница 20: ...electricity supply and water supply at the mains The inlet filter is situated in the bottom of the inlet pipe fig 20 To gain access to the filter remove the cover and then unscrew the assembly from t...

Страница 21: ...ch Module P22611003 5 Can Assembly 8 5kW 83314800 Can Assembly 9 5kW 83314810 Can Assembly 10 5kW 83314820 6 Outlet Pipe and PRD S23511002 7 Terminal Block wires S82201240 8 Thermal Cut Out TCO 220123...

Страница 22: ...educe flow rate via temperature control Is water supply mains or tank fed If tank fed replumb to mains water supply or see 4 2 4 If mains fed make sure that the mains stopvalve is fully open and there...

Страница 23: ...4 2 4 4 3 1 4 3 2 4 4 1 5 1 1 6 1 1 6 2 1 6 3 1 6 4 1 7 1 1 7 2 1 7 3 1 required see rating label Reduction in ambient water temperature Electrical malfunction or safety cut out operated Water pressu...

Страница 24: ...IVORY 4 electric shower 22 Entry Points Diagram Key Water Entry Points Cable Entry Points...

Страница 25: ...IVORY 4 electric shower 23...

Страница 26: ...IVORY 4 electric shower 24...

Страница 27: ...nt Agency under the following schemes Repic Producers take back scheme PTS registration number WEE EJ3466QV Valpak Distributor take back scheme DTS registration number 9659 All our electric products a...

Страница 28: ...your details including post code the model number and power rating of the product together with the date of purchase and where applicable details of the particular fault 2 If required the Customer Se...

Отзывы: