P.O. Box 309, Menomonee Falls, WI USA 53052-0309
800 BRADLEY (800 272 3539) +1 262 251 6000
bradleycorp.com
Installation
215-1813 Rev. C; ECN 16-03-002
© 2016 Bradley
Page 1 of 4 1/11/2016
ABP-1WCA Surface Mount
Ablution System
Air Metering Valve AST
TouchTime™ (TT)
Single Valve(SV & SVL)
WARNING
Make sure that all water supply lines have been flushed and then completely turned off before beginning
installation. Debris in supply lines can cause valves to malfunction.
IMPORTANT
Read this entire installation manual to ensure proper installation. When finished with the installation, file
this manual with the owner or maintenance department. Compliance and conformity to local codes and
ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding packaging
material. If any parts are missing, do not begin installation until you obtain the missing parts.
Product warranties may be found under “Products” on our web site at www.bradleycorp.com.
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Rough-Ins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Cleaning and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . 4