background image

P.O. Box 309, Menomonee Falls, WI  USA  53052-0309
800 BRADLEY (800 272 3539)     +1 262 251 6000
bradleycorp.com

Installation 

215-1813 Rev. C; ECN 16-03-002

© 2016 Bradley

Page 1 of 4  1/11/2016

ABP-1WCA Surface Mount 

Ablution System

Air Metering Valve AST 

TouchTime™ (TT) 

Single Valve(SV & SVL)

WARNING

Make sure that all water supply lines have been flushed and then completely turned off before beginning 
installation. Debris in supply lines can cause valves to malfunction.

IMPORTANT

Read this entire installation manual to ensure proper installation. When finished with the installation, file 
this manual with the owner or maintenance department. Compliance and conformity to local codes and 
ordinances is the responsibility of the installer.

Separate parts from packaging and make sure all parts are accounted for before discarding packaging 
material. If any parts are missing, do not begin installation until you obtain the missing parts.

Product warranties may be found under “Products” on our web site at www.bradleycorp.com.

Table of Contents

Pre-Installation Information   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 2
Rough-Ins   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 3
Installation  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4
Cleaning and Maintenance   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4

Отзывы: