
17
Connect the 20~57V DC power supply to the PWR & RPS terminal block or 4-pin
power adapter to DC jack receiver on the top of the Switch (Refer to “
Wiring
Redundant Power Inputs
”).
Step 4: Connect the Ethernet (RJ45) port to the networking device and check the
LED status to confirm the connection is established.
DIN Rail Installation
The NGI-M05-C1 has a DIN rail bracket on the back of the Switch.
Location:
The NGI-M05-C1 can be DIN-Rail-mounted in cabinet or enclosure.
Mounting the Switch
Place the NGI-M05-C1 on the DIN rail from above using the slot. Push the front of the
switch toward the mounting surface until it snaps into place with a click sound.
Содержание NGI-M05-C1
Страница 49: ...49 Refresh Click Refresh to begin configuring this screen afresh...
Страница 53: ...53 1000 full 1000Mbps Full duplex force mode 1000 full n 1000Mbps Full duplex auto negotiation mode...
Страница 62: ...62 Apply Click Apply to take effect the settings Refresh Click Refresh to begin configuring this screen afresh...
Страница 76: ...76 global state is enabled user must enable per VLAN states to enable the IGMP Snooping on the specific VLAN...
Страница 122: ...122...
Страница 125: ...125 Refresh Click Refresh to begin configuring this screen afresh...
Страница 151: ...151 Download Clicks the Download button to download all of the regisers information to load host...