background image

 

 

              AT.654252.409 ver.1.2 

Quickstart manual 

ATTENTION! Filter power capacitors conserve the charge hazardous to 
life within 5 minutes after de-energization! Prior to execution of work 
inside the cabinet make sure that capacitors are de-energized. Filter 
power  capacitors  conserve  the  charge  hazardous  to  life  within  5 
minutes after de-energization! 

ATTENTION!  It  is  prohibited  to  disconnect  and  connect  detachable 

joints if supply voltage is available. Electronic control units of Variable 
Speed Drives contain components made on the basis of metal-oxide-
semiconductor  (MOS)  technology  excluding  the  action  of  static 

electricity.  If  you  need  to  touch  some  MOS  component, ground  your 
body and the tools to be used. 

Safety Recommendation

 

The  drive  must  be  installed,  adjusted  and  serviced  by  qualified  electrical 

maintenance personnel. Improper installation or operation of the drive may cause 
injury  to  personnel  or  damage  to  equipment.  The  drive  must  be  installed  and 
grounded in accordance with local and national electrical codes. There is a deadly 

level of voltage in drive’s 

cabinet. Extreme care must be taken to ensure all power 

sources  are  disconnected  before  starting  installation,  maintenance  and  repair 
jobs. Whenever a drive containing a SCADA or telemetry connection is to be re-
paired or serviced, the service man must disconnect any communication devices 
attached  to  the  drive  to  prevent  unexpected  start  commands from  the  remote 
control system. Service men must be aware that there could be more than one 
remote telemetry  connection  and that  all  of them  must  be  disabled  or  discon-
nected for the duration of the repair period. Once repairs are completed, the te-
lemetry connections must be reestablished. 

Personal Protective Equipment (PPE)

 

The basic personal protection equipment (PPE) required for field service in-

cludes, but is not limited to, steel toe shoes, safety glasses and a hard hat. If elec-
trical configuration or maintenance is performed on potentially energized circuits, 
personal  protective equipment  is  required  to  minimize  the  danger  or  electrical 
shock, arc flash and/or arc blast. The level of PPE required can vary based upon 
the available electrical energy available at the installation site. If any doubt exists, 
consult and employ the recommendations published in the National Fire Protec-
tion Code, NFPA-70E. 

Safety Procedures

 

Work inside the cabinets must be performed with the power off. Isolate energy 

source(s) and use proper Lock Out/Tag Out (LOTO) procedures and Personal Pro-
tective  Equipment  (PPE)  to  ensure  personnel  safety.  The  drive  also  contains 
stored  sources  of  energy  in  the  form  of  capacitors.  Allow  sufficient  time  after 
power is removed for those capacitors to discharge to a safe level below 50 V DC. 
The bleed resistors attached to the capacitors reduce the voltage to safe levels 

Содержание AK06-CP

Страница 1: ...Quickstart Manual...

Страница 2: ...ith step up transformer During commissioning must be set up protections operation and starting modes in accordance to a field standards or well design Explanation of VSD controller settings are given...

Страница 3: ...part of this publication may be reproduced or copied without prior written permission from Triol Trading LLC All products and company names mentioned in this manual are trademarks or registered tradem...

Страница 4: ...on 8 Overview of UMKA07 menu structure 12 Variable Speed Drive starting procedure 15 VSD function testing 16 No Load Test 18 Asynchronous motor start 20 Permanent magnet motor start 21 Auto set up pro...

Страница 5: ...working with VSD the staff must be specially trained and examined in labor protection issues attend a preliminary medical examination when hired for work and peri odic health examinations during the e...

Страница 6: ...rvice man must disconnect any communication devices attached to the drive to prevent unexpected start commands from the remote control system Service men must be aware that there could be more than on...

Страница 7: ...7 AT 654252 409 ver1 2 AT 654252 409 ver 1 2 Quickstart manual within five minutes of power down Confirm removal of energy source using a proven voltage indicator device...

Страница 8: ...485 All VSD parameters and operation data are displayed by UMKA07 controller via its large 7 800 480 dots liquid crystal touch screen located in the upper part of the controller front panel All messag...

Страница 9: ...9 AT 654252 409 ver1 2 AT 654252 409 ver 1 2 Quickstart manual VSD AK06 UD and CP lines internal design VSD AK06 RD line internal design...

Страница 10: ...s to show that there are no reasons which may prevent motor from starting up and a countdown to automatic restart begins Red indicator HL3 STOP indicates the VSD OFF state without any capability of au...

Страница 11: ...missioning V X Operating V V Recovery V V Access to menu levels is protected by a password To change the status of a particular access level V permitted X restricted tap on the current access level on...

Страница 12: ...12 AT 654252 409 ver 1 2 Quickstart manual Overview of UMKA07 menu structure...

Страница 13: ...eneral overview of UMKA07 interface is shown on the picture below Figure 2 UMKA07 interface overview First level menu Third level menu Second level menu Access level Operation mode VSD State Parameter...

Страница 14: ...s with helpful information about the chosen parameter Settings of a parameter that can have a defined value are made by selecting a desired value from the list of possible values The parameter is high...

Страница 15: ...e environmental conditions supply voltage check if the con nected equipment corresponds with the VSD nameplate 2 Check the mounting power connections and grounding reference with the operation manual...

Страница 16: ...KA controller menu 1 Commissioning Installation parameters Motor Motor type Set up type of motor Asyn chronous Press Confirm Note to make the no load test set the Asynchronous type of motor only 2 Com...

Страница 17: ...SUT primary voltage V SUT rated frequency Hz Set up the SUT tap Volt age The SUT tap Voltage set point must be selected ac cording to the real connected tap and must be not less than the Recom tap vol...

Страница 18: ...age pa rameter in Commissioning Installation parameters SUT Step Up Transformer tap differs from supply voltage than the parameter must be set according to the supply voltage value 1 Go to Menu Commis...

Страница 19: ...volt age and frequency Voltage here is the VSD output Volt age can be set equal to sup ply voltage then press parameter Straight U F the control ler automatically trans forms the curve in line 3 Go t...

Страница 20: ...the installed equip ment type operation condi tions and technology compli ance To set up frequency for a motor go to Operating set the required frequency in the parameter Frequency set ting Motor fre...

Страница 21: ...K06 in vector control mode with permanent magnet motor change drive type to PMM Vector Go to Commissioning Installation parameters Motor Motor type set up the type of the drive to PMM Vector After set...

Страница 22: ...eries Add new motor if in list absent motor For add new motor press Add new Add a motor using the help Step 2 Select the motor type Add new motor if in list absent motor For add new motor press Add ne...

Страница 23: ...p 4 Set up cable parame ters and operation conditions Step 5 Enter SUT parame ters according to the name plate Step 6 Check additional pa rameter of the select motor Set up parameter if add new motor...

Страница 24: ...erating fre quency acceleration rate and deceleration rate TO START A MOTOR PRESS Step 8 VSD automatic accel eration motor to the set fre quency After motor acceleration to the set frequency on contro...

Страница 25: ...below for successful downhole equipment connection de energize the VSD by turning the circuit breakers to OFF wait 5 minutes for the DC link capac itors to discharge the UMKA07 screen and the Backspi...

Страница 26: ...V or 220 V according to the Downhole Measuring equipment datasheet connect the RS 485 or RS 232 in terface circuit to the external ter minal connect the surface unit high voltage cable of the Downhole...

Страница 27: ...t Protocol DME according to the downhole equipment type Press Confirm Parameter Gauge must be set as Identified turn Auto setup on Yes Downhole data must be displayed on the screen set up the protecti...

Страница 28: ...energize the VSD by turning the circuit breakers OFF wait 5 minutes for the DC link capacitors to discharge the UMKA07 screen and the Back spin light fade connect SCADA the RS485 or RS232 to the termi...

Страница 29: ...iol AK UMKA07 then press Confirm Triol AK UMKA07 Mod bus Map is given at Triol Corporation website https triolcorp us documents Switch the VSD to Remote mode If it is acceptable start the VSD by SCADA...

Страница 30: ...uts specified in the order The configuration of the terminal block of external connections can be changed based on the applied configuration of the expansion units The terminal block for external conn...

Страница 31: ...OFF wait 5 minutes for the DC link capac itors to discharge the UMKA07 screen and the backspin light fade there are 5 analog inputs on USP in the connection compartment Numbers of analog inputs de pen...

Страница 32: ...terminal 24V Signal wire of the sensor connect to the 16th Ain0 USP energize the VSD by turning the circuit breakers ON go to Commissioning In puts Outputs Analog in puts switching between the setup m...

Страница 33: ...n and the Back spin light fade there are 5 digital inputs on USP in the connection compartment according to the scheme oncon nect the digital inputs For example to connect a sig nal to the 0th didgita...

Страница 34: ...ng In put Outputs Digital in puts switching between the setup menu of each digital input is per formed using the buttons lo cated at the bottom of the screen select Digital input set up the logic of t...

Страница 35: ...35 Some text here AT 654252 409 ver 1 2 2021...

Отзывы: