background image

 

 

 

AT.654252.409 ver1.2 

AT.654252.409 ver.1.2 

Quickstart manual 

Safety requirements and personnel 
qualification 

All the activities on installation, mounting, dismantling, operation and mainte-

nance of a Variable Speed Drive must be carried out in conformity with effective 
local and electrical codes and regulations. Improper installation and operation of 
the drive may result in personal injury or equipment damage. There is a deadly 
level of voltage in 

drive’s cabinet. When working on installation, maintenance, re-

pair, it is vital to monitor the absence of voltage at the input and output terminals 
of VSD. 

Before start working with VSD the staff must: 

 

be specially trained and examined in labor protection issues; 

 

attend a preliminary medical examination (when hired for work) and peri-
odic health examinations (during the entire labor activity); 

 

have electrical safety qualification. 

At conducting connection to the power supply line there a special attention 

must  be  paid  to  ensuring  of  reliable  grounding  of  VSD  casing.  Grounding  re-
sistance must meet the local and national requirements. 

At executing any work inside Variable Speed Drive the 
following safety measures must be performed: 

 

circuit  breaker  ON/OFF 
must be placed to 

«

OFF

»

 po-

sition; 

 

leading-in  cables  must  be 
de-energized; 

 

warning  tags  must  be  put 

«

ON

»

 

make  sure  that  leading-in 
cables are 

de-energized 

and 

ground them. 

 

 

 

circuit breaker handle may change place in different VSD’s types.

Содержание AK06-CP

Страница 1: ...Quickstart Manual...

Страница 2: ...ith step up transformer During commissioning must be set up protections operation and starting modes in accordance to a field standards or well design Explanation of VSD controller settings are given...

Страница 3: ...part of this publication may be reproduced or copied without prior written permission from Triol Trading LLC All products and company names mentioned in this manual are trademarks or registered tradem...

Страница 4: ...on 8 Overview of UMKA07 menu structure 12 Variable Speed Drive starting procedure 15 VSD function testing 16 No Load Test 18 Asynchronous motor start 20 Permanent magnet motor start 21 Auto set up pro...

Страница 5: ...working with VSD the staff must be specially trained and examined in labor protection issues attend a preliminary medical examination when hired for work and peri odic health examinations during the e...

Страница 6: ...rvice man must disconnect any communication devices attached to the drive to prevent unexpected start commands from the remote control system Service men must be aware that there could be more than on...

Страница 7: ...7 AT 654252 409 ver1 2 AT 654252 409 ver 1 2 Quickstart manual within five minutes of power down Confirm removal of energy source using a proven voltage indicator device...

Страница 8: ...485 All VSD parameters and operation data are displayed by UMKA07 controller via its large 7 800 480 dots liquid crystal touch screen located in the upper part of the controller front panel All messag...

Страница 9: ...9 AT 654252 409 ver1 2 AT 654252 409 ver 1 2 Quickstart manual VSD AK06 UD and CP lines internal design VSD AK06 RD line internal design...

Страница 10: ...s to show that there are no reasons which may prevent motor from starting up and a countdown to automatic restart begins Red indicator HL3 STOP indicates the VSD OFF state without any capability of au...

Страница 11: ...missioning V X Operating V V Recovery V V Access to menu levels is protected by a password To change the status of a particular access level V permitted X restricted tap on the current access level on...

Страница 12: ...12 AT 654252 409 ver 1 2 Quickstart manual Overview of UMKA07 menu structure...

Страница 13: ...eneral overview of UMKA07 interface is shown on the picture below Figure 2 UMKA07 interface overview First level menu Third level menu Second level menu Access level Operation mode VSD State Parameter...

Страница 14: ...s with helpful information about the chosen parameter Settings of a parameter that can have a defined value are made by selecting a desired value from the list of possible values The parameter is high...

Страница 15: ...e environmental conditions supply voltage check if the con nected equipment corresponds with the VSD nameplate 2 Check the mounting power connections and grounding reference with the operation manual...

Страница 16: ...KA controller menu 1 Commissioning Installation parameters Motor Motor type Set up type of motor Asyn chronous Press Confirm Note to make the no load test set the Asynchronous type of motor only 2 Com...

Страница 17: ...SUT primary voltage V SUT rated frequency Hz Set up the SUT tap Volt age The SUT tap Voltage set point must be selected ac cording to the real connected tap and must be not less than the Recom tap vol...

Страница 18: ...age pa rameter in Commissioning Installation parameters SUT Step Up Transformer tap differs from supply voltage than the parameter must be set according to the supply voltage value 1 Go to Menu Commis...

Страница 19: ...volt age and frequency Voltage here is the VSD output Volt age can be set equal to sup ply voltage then press parameter Straight U F the control ler automatically trans forms the curve in line 3 Go t...

Страница 20: ...the installed equip ment type operation condi tions and technology compli ance To set up frequency for a motor go to Operating set the required frequency in the parameter Frequency set ting Motor fre...

Страница 21: ...K06 in vector control mode with permanent magnet motor change drive type to PMM Vector Go to Commissioning Installation parameters Motor Motor type set up the type of the drive to PMM Vector After set...

Страница 22: ...eries Add new motor if in list absent motor For add new motor press Add new Add a motor using the help Step 2 Select the motor type Add new motor if in list absent motor For add new motor press Add ne...

Страница 23: ...p 4 Set up cable parame ters and operation conditions Step 5 Enter SUT parame ters according to the name plate Step 6 Check additional pa rameter of the select motor Set up parameter if add new motor...

Страница 24: ...erating fre quency acceleration rate and deceleration rate TO START A MOTOR PRESS Step 8 VSD automatic accel eration motor to the set fre quency After motor acceleration to the set frequency on contro...

Страница 25: ...below for successful downhole equipment connection de energize the VSD by turning the circuit breakers to OFF wait 5 minutes for the DC link capac itors to discharge the UMKA07 screen and the Backspi...

Страница 26: ...V or 220 V according to the Downhole Measuring equipment datasheet connect the RS 485 or RS 232 in terface circuit to the external ter minal connect the surface unit high voltage cable of the Downhole...

Страница 27: ...t Protocol DME according to the downhole equipment type Press Confirm Parameter Gauge must be set as Identified turn Auto setup on Yes Downhole data must be displayed on the screen set up the protecti...

Страница 28: ...energize the VSD by turning the circuit breakers OFF wait 5 minutes for the DC link capacitors to discharge the UMKA07 screen and the Back spin light fade connect SCADA the RS485 or RS232 to the termi...

Страница 29: ...iol AK UMKA07 then press Confirm Triol AK UMKA07 Mod bus Map is given at Triol Corporation website https triolcorp us documents Switch the VSD to Remote mode If it is acceptable start the VSD by SCADA...

Страница 30: ...uts specified in the order The configuration of the terminal block of external connections can be changed based on the applied configuration of the expansion units The terminal block for external conn...

Страница 31: ...OFF wait 5 minutes for the DC link capac itors to discharge the UMKA07 screen and the backspin light fade there are 5 analog inputs on USP in the connection compartment Numbers of analog inputs de pen...

Страница 32: ...terminal 24V Signal wire of the sensor connect to the 16th Ain0 USP energize the VSD by turning the circuit breakers ON go to Commissioning In puts Outputs Analog in puts switching between the setup m...

Страница 33: ...n and the Back spin light fade there are 5 digital inputs on USP in the connection compartment according to the scheme oncon nect the digital inputs For example to connect a sig nal to the 0th didgita...

Страница 34: ...ng In put Outputs Digital in puts switching between the setup menu of each digital input is per formed using the buttons lo cated at the bottom of the screen select Digital input set up the logic of t...

Страница 35: ...35 Some text here AT 654252 409 ver 1 2 2021...

Отзывы: