Date: June 14th, 2019 Doc No:
PS-M-0693
Ver. A Page 9 of 29
日期:
2019
年
6
月
14
日
文件编号:
PS-M-0693
发行版本号:
A
第
9
页,共
29
页
4.2.3 Cover off the carton and take out
two or three of the upper cover plate
拿掉纸箱上盖,取出二或者三个上层盖板
4.2.4 Two people, on the both side of the
box, lifting a module in the meantime.
One hand holds the top corner of
module, and the other hand holds the
middle of the short side. Taking out the
module at the same time
两人站在箱子
两侧,同时提住组件,一只手抓住组件的
一角,另一只手抓住短边,同时将组件取
出
4.2.5 When unpacking on a level surface
(Please refer to 3.1.8);
When unpacking on the un-level surface,
need to have a protection solution for
falling.
若在水平地面拆包,请参考
3.1.8
;
若在非水平地面拆包,需要做好防倾斜措
施。
4.2.6 Do NOT lean the module on the
mounting posts;
禁止将组件斜靠在安装柱子上;
4.2.7 If the Duomax must be stacked, put isolation material between two modules.
The thickness of the insulating material is 10mm higher than the highest point of the
module( J-
Box or hook), we recommend use the density of EPE ≥ 28KG/m3.; the
quantity of duomax to be stacked is ≤10pcs and the time of stack is ≤5 days. During
the stacking process, the modules should not bend due to the uneven thickness of the
insulating material. If this phenomenon occurs, it should be adjusted immediately. We
recommend not to be stacked if there is no isolation material.
如果双玻组件需要堆放,托盘放置在水平地面上,组件必须堆放在托盘上;组件数量
≤10pcs
;堆码时间
≤5
天;两块组件之间必须使用隔离材料,隔离材料厚度大于组件突
出物最高点尺寸
10mm
(接线盒或者挂钩),推荐使用密度大于
28KG/m³
的
EPE
;隔
离材料采用
6
个点的放置。组件堆叠过程中避免因隔离材料厚度不均造成的组件倾斜弯
曲,如出现此现象需即刻调整。如果没有隔离材料,不建议水平堆放。
5. INSTALLATION
安装
Trina Solar Duomax series modules may be installed in the following conditions
for more than 30 years. In addition to the required IEC certification, Trina Solar
products have also been tested to verify resistance to ammonia fumes that may be
present around barns sheltering cattle, as well as suitability for installation in humid
(coastal) areas and areas of high sand storms.