Notice: The contents of this document are proprietary and confidential and the property of Trilliant Holdings Inc., its subsidiaries, affiliates, and/or
licensors. This document is provided subject to the confidentiality obligations set forth in the agreement between your company and Trilliant. The contents
may not be used or disclosed without the express written consent of Trilliant.
19
Installation Guide for SecureMesh WAN® Gateway 2 - PL-0073A
Figure 4:
Accessory bag with screws, bolts, nuts and washers
Screws, bolts, nuts and washers:
1. 1/4-28 hex head bolts, 1" and 2"
2. 1/4-20 pan head screws, 0.75"
3. 1/4" lock washers and flat washers
4. Ground lug
Preparing the gateway
Follow the steps below to configure and prepare the GATE-2000 prior to installation.
Note:
It is recommended that you complete these steps in a lab or
workshop before arriving at the permanent installation site.
represents the basic GATE-2000 configuration and wiring. The following
steps describe the attachment of the mounting clamp and surge suppressor and the
assembly of the device side cable (DSC).