13
4
Transportation & lifting
•
Tanks must be held down during transportation using nylon straps, do not use cables
or chains to secure tanks. Do not over tighten straps that can result in deformation of the
tank shell. Do not drop or roll tanks from the truck.
•
Move tanks only by lifting and setting, do not drag or roll.
•
Always set the tank(s) on flat, smooth ground clear of any debris. Tanks may need to be tied
down and chocked to prevent movement. Position the chocks in the locations shown below:
•
It is best to lift tanks by a machine and webbing lifting straps
–
do not use chains or wire ropes
in contact with the tank.
•
Ensure tank is empty when lifting.
•
Care is needed to control the lift so as to ensure the tank is not damaged.
•
Ensure the slings are positioned at a joint on the tank, firmly secured, and the load is
evenly balanced.
4.1
Lifting tanks of 1-4 modules (Max. 4.6m)
•
Tanks up to 4.6m in length should be lifted using the eyebolts on the tank.
•
Tanks up to 4.6m in length can be lifted using only lifting straps, as shown in
Option 1
, next
page. However, on sites where lifting height is restricted, a lifting bar should be used as
shown in
Option 2
:
Содержание Novo UK10
Страница 1: ...0 106 Rev 11 Dec 2017 Tricel Novo UK6 50 Wastewater Treatment Plants Engineering a green future...
Страница 4: ...3...
Страница 5: ...4...
Страница 10: ...9...
Страница 11: ...10...
Страница 26: ...25 5 11 1 Electrical Diagrams 5 11 1 1 Tricel Novo Gravity Outlet UK6 UK8 UK10 UK12 Control Panel No 209102...
Страница 27: ...26 UK18 UK24 Control Panel No 209116...
Страница 28: ...27 UK30 UK36 UK42 UK50 Control Panel No 209111...
Страница 29: ...28 5 11 1 2 Tricel Novo Pumped Outlet UK6 UK8 UK10 UK12 UK18 UK24 Control Panel No 209101...
Страница 30: ...29 UK30 UK36 UK42 UK50 Control Panel No 209112...
Страница 42: ...41 12 Terms conditions Subject to our standard terms and conditions which are available on request...
Страница 43: ...42...