Fit the grease trap before the Tricel Novo as best practice indicates, particularly in applications
where high quantities of grease/oil exist in the wastewater.
•
The grease trap must be monitored on a regular basis and emptied when required so as to
ensure continued effective performance.
5.12.2
Sampling chamber
•
Best practice indicates that a sampling chamber is fitted after every Tricel Novo to allow
easy access for sampling purposes.
•
Care should be taken to ensure that the sampling apparatus does not come into contact with
the pipework or walls of the sampling chamber to avoid contamination of the sample.
•
The inlet of the sampling chamber must be higher than the outlet to facilitate the sampling
cup.
6
Plant operation
Once tank installation, plumbing and the electrical connection are complete, the Tricel Novo is now
operational. The plant should be filled with water during installation. If you have not, it should be
filled before its first use. If the plant is running correctly, you will hear a slight
“
hum
”
from the
air blower, and there will be air bubbles coming up evenly from the bottom of the aeration chamber,
rising to the surface.
Once i n s t a l l a t i o n o f the Tricel Novo plant is complete and i t i s operational, it is important
that it be commissioned by our service team or a Tricel Novo distributor to ensure it is working
effectively. A commissioning certificate will then be issued to the customer.
The plant runs 24 hours a day, seven days a week all year round for optimum purification. In periods
of low occupancy, the sludge return system re-circulates the liquid in the plant ensuring continuous
performance. In periods of overload the sludge return plant passes the l i q u i d back into the
p r i m a r y c h a m b e r , so it p a s s e s through the aeration chamber again ensuring continuous
performance. It may take up to 13 weeks for the biomass to become fully established and to reach
optimum purification. All plants come fitted with an alarm, which will alert of irregularities in the plant.
Содержание Novo UK10
Страница 1: ...0 106 Rev 11 Dec 2017 Tricel Novo UK6 50 Wastewater Treatment Plants Engineering a green future...
Страница 4: ...3...
Страница 5: ...4...
Страница 10: ...9...
Страница 11: ...10...
Страница 26: ...25 5 11 1 Electrical Diagrams 5 11 1 1 Tricel Novo Gravity Outlet UK6 UK8 UK10 UK12 Control Panel No 209102...
Страница 27: ...26 UK18 UK24 Control Panel No 209116...
Страница 28: ...27 UK30 UK36 UK42 UK50 Control Panel No 209111...
Страница 29: ...28 5 11 1 2 Tricel Novo Pumped Outlet UK6 UK8 UK10 UK12 UK18 UK24 Control Panel No 209101...
Страница 30: ...29 UK30 UK36 UK42 UK50 Control Panel No 209112...
Страница 42: ...41 12 Terms conditions Subject to our standard terms and conditions which are available on request...
Страница 43: ...42...