40
Tricel (Killarney)
Ballyspillane Ind Est
Killarney
Co. Kerry
Ireland
13
DOP01CPRUK03201414
EN 12566-3
Packaged wastewater treatment plants
for treatment of domestic wastewater
-
Product: Tricel Novo UK6
–
UK50 Range of Wastewater Treatment Plants
-
Material:
GRP
Notified Body:
Prüfinstitut für Abwassertechnik GmbH
Hergenrather Weg 30
52074 Aachen
Number.:
NB 1739
Treatment capacity
-
Nominal organic daily load: (BOD
5
)
-
Nominal Hydraulic daily flow (Q
N
)
As Set Out in
Table CE
for each Model
Effectiveness of treatment:
Treatment efficiency ratios (at tested organic daily load
BOD5 of 0,26 kg/d and daily hydraulic flow of 0.9m
3
/d)
COD: 91,6 %
BOD
5
: 95,9 %
SS: 95,3 %
NH
4
-N: 56,7 %
Water tightness: (Vacuum test)
Crushing resistance: (Pit test)
Pass (also Wet
conditions)
Durability
Pass
Fire Resistance
Class E
Содержание Novo UK10
Страница 1: ...0 106 Rev 11 Dec 2017 Tricel Novo UK6 50 Wastewater Treatment Plants Engineering a green future...
Страница 4: ...3...
Страница 5: ...4...
Страница 10: ...9...
Страница 11: ...10...
Страница 26: ...25 5 11 1 Electrical Diagrams 5 11 1 1 Tricel Novo Gravity Outlet UK6 UK8 UK10 UK12 Control Panel No 209102...
Страница 27: ...26 UK18 UK24 Control Panel No 209116...
Страница 28: ...27 UK30 UK36 UK42 UK50 Control Panel No 209111...
Страница 29: ...28 5 11 1 2 Tricel Novo Pumped Outlet UK6 UK8 UK10 UK12 UK18 UK24 Control Panel No 209101...
Страница 30: ...29 UK30 UK36 UK42 UK50 Control Panel No 209112...
Страница 42: ...41 12 Terms conditions Subject to our standard terms and conditions which are available on request...
Страница 43: ...42...