IMPORTANT: TO AID ASSEMBLY, IT IS NECESSARY
TO APPLY A THIN BEAD OF LUBRICANT (E.G.
WASHING - UP LIQUID OR VASELINE) TO ALL FLUE
JOINTS THAT INCORPORATE ‘O’- RING SEALS.
AS THE FLUE SYSTEM OPERATES UNDER
POSITIVE PRESSURE, ALL FLUE JOINTS THAT DO
NOT INCORPORATE ‘O’- RING SEALS SHOULD BE
SEALED WITH SILICONE SEALANT.
THE BOILER PRODUCES CONDENSATE DURING
NORMAL RUNNING, IT IS IMPORTANT TO ENSURE
ALL SEALS ARE MADE AND CORRECT GASKETS
USED.
TO ENSURE ANY CONDENSE PRODUCED IN THE
FLUE DRAINS AWAY INCLINE THE FLUE SLIGHTLY
FROM THE BOILER
TERMINAL GUARDS (Fig. 16)
When the terminal is positioned where there is the
possibility of accidental contact by persons, or of
damage to the terminal, an approved guard is necessary.
Generally, exhaust 2 metres above ground level
alleviates the necessity for a guard.
A suitable guard is available from Trianco, Part No
204123.
17
267mm
343mm
300mm
All sizes in mm approximate.
2350 & 2351 HORIZONTAL TELESCOPIC BF
ROUND KIT
ASSEMBLY METHOD
1. Having decided the position of the boiler, accurately
mark out the position of the terminal and cut a hole
130mm diameter through the wall. (See Figs. 17/18
and 19).
2. Unpack the boiler.
3. Lift off the top panel.
4. Remove the four nuts securing the flue socket in
place.
5. Take flue socket plate off top of boiler leaving the flue
gasket in position.
6. If the flue is to be fitted terminating to the left or right
hand side of the boiler, the corresponding section of
side casing must be removed.
7. To remove the section of side casing, cut through the
retaining tabs.
8. Fit sealing plate over four studs leaving the flue gasket
in position and place terminal gasket on top of sealing
plate. Both these gaskets are supplied with boiler.
9. Position the boiler.
10. Unpack the Terminal Kit and identify all components.
11. Check to see that the O-ring is in location groove on
the inner flue pipe of elbow duct assembly. Applying
a small amount of lubricant i.e. vaseline to O-ring will
aid assembly.
12. Assemble kit together by sliding flue terminal inside
terminal elbow duct assembly.
13. Slide completed assembly through the wall from inside.
14. Move boiler in position and holding up terminal mounting
flange, slide terminal back between fixing studs on
boiler.
15. Slide terminal mounting plate down over studs and
secure using the four nuts previously removed.
16. Adjust terminal length to give a minimum distance of
140mm from end of terminal to wall.
17. Connect hose from burner to socket on end of terminal
using clip provided.
18. Make good the inside and outside wall around the flue
(ie cement or suitable filler).
19. Replace top panel.
Trianco flue kits are designed to incorporate the latest ‘O’-ring seals.
Before commencing assembly, please make sure that all ‘O’-rings seals are in position.
FIG.16
Содержание EuroStar Premier 50/90 Condensing
Страница 10: ...FIG 5 WIRING DIAGRAM 7...