FITTING INSTRUCTIONS (cont.)
3) Removing the front panel beforehand, hang the
boiler onto the screws in the wall, ensuring that all
4 keyhole fixing slots are utilised. Tighten screws
to ensure a secure fixing.
4) Fit the 2 x cable strain reliefs into the base of the
boiler.
5) Install the heating system (radiator/towel rails, etc)
in the desired positions as per the manufacturer's
instructions. A drain cock must be fitted at the
lowest part of the system for ease of drainage.
See
Fig. 4
for a typical system layout.
IMPORTANT
While the Aztec Gold is entirely suitable for use on
heating systems which utilise plastic pipework, the
first 100mm from the boiler manifold must always
be 15mm copper.
5
FIG. 3 - STRAIN RELIEF FIXING
Содержание Aztec Gold
Страница 14: ...14 FIG 17 BOILER SCHEMATIC ...