FITTING INSTRUCTIONS (cont.)
Filling Method 2: Filling Loop (Fig. 12)
1) During installation, feed a permanent 15mm
supply to any part of the system via the use of a
WRC-approved filling loop. A fixed-spindle stop
valve should also be fitted to the mains water
supply to the system.
2) Open the supply valves to fill the system, following
all further instructions as per those for filling with a
hose from (4) onwards
(page 8)
.
3) Once complete, close all supply valves.
Notes:
a) The filling method adopted must be in accordance
with the Water Supply Regulations and the Water
Bylaws.
b) Approved hose unions should be used on all
connections of this type.
COMPLETION
1) Replace the front casing of the boiler.
2) Switch on the electricity supply to the boiler and
external controls.
The appliance is now ready for use
(Fig. 13).
See overleaf for additional fitting instructions when
using the boiler in conjunction with underfloor heating
systems.
9
FIG. 12 - FILLING METHOD 2
FIG. 13 - COMPLETED INSTALLATION