![Trebor QUANTUM NXT Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/trebor/quantum-nxt/quantum-nxt_operation-and-maintenance-manual_1154898029.webp)
QUANTUM NXT DI HEATER OPERATION / MAINTENANCE MANUAL
PAGE 29
5 SHUT DOWN
The DI water heater may be shut down by the following methods:
Select the OFF button on the control screen to put the heater in standby
(heater element power will be disengaged).
Rotate “Main Breaker” to off position.
Turn off the facility supply.
Lockout and tag out heater for maintenance, repair or decommissioning.
Refer to Section 2.5.