Installation
(for qualified installers only)
7
© Travis Industries
4090807
100-01193_003
Packing List
•
Propane Conversion Kit (orifice, rate screw)
•
Log Set
•
Remote Control and Wireless Wall Switch
•
Reset Rod
•
Battery Box with 12’ Wire Lead
•
Door Latch Tool
•
Andiron Brackets
Additional Items Required
•
1080/36 CF Direct Vent (available only from Travis Industries – see page 26 for part numbers)
•
Gas Line Equipment (shutoff valve, pipe, etc.)
Installation Overview
•
All requirements below must be met.
Non-combustible facing -
(included) see the section
"Facing Requirements"
See the section
"Vent Requirements"
See the section
"Minimum Framing Dimensions"
AAAAAAAAA
AAAAAAAAA
AAAAAAAAA
AAAAAAAAA
AAAAAAAAA
Nailing Brackets
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
Drywall (or
other
combustible)
11"
Min.
See the section
"Mantel Requirements"
See the section
"Hearth Requirements"
See the section "Control Panel
Installation"
NOTE: Control wire is 12' long.
Side
Wall
Figure 3