![background image](http://html1.mh-extra.com/html/trane/vav-ucm-4-2/vav-ucm-4-2_installation-and-maintenance-manual_1149794057.webp)
VAV-SVX01C-EN
57
Air and Water Balancing
Water Balancing
Each VAV UCM can have its hot water valve overridden to drive fully OPEN (2-position and
proportional). This can be done in the Rover Configuration UCM setup menu and can be used to
assist in water balancing.
1.
Access VAV UCM with Rover service software.
2. Select a VAV box to balance, and drive its hot water valve open (max hot water override).
3. Using hydraulic pressure gauges, measure the flow across the high and low ports. Convert this
data from a pressure differential to gallons per minute (GPM).
4. Adjust the circuit setter until it is within design specifications.
5. Once achieved, lock the circuit setter in place. Mark the position with a permanent indicator.
6. Remove all gauges and software overrides.
Figure 33. Rover configuration UCM setup menu
Содержание VAV-UCM 4.2
Страница 1: ...May 2010 VAV SVX01C EN Installation Operation Maintenance VAV UCM 4 2...
Страница 81: ...VAV SVX01C EN 81 Troubleshooting Figure 46 Single duct with single phase voltage electric heat...
Страница 82: ...82 VAV SVX01C EN Troubleshooting Figure 47 Single duct with three phase voltage electric heat...
Страница 83: ...VAV SVX01C EN 83 Troubleshooting Figure 48 SCR PSC fan powered with single phase voltage electric heat...
Страница 84: ...84 VAV SVX01C EN Troubleshooting Figure 49 SCR PSC fan powered with three phase voltage electric heat...
Страница 85: ...VAV SVX01C EN 85 Troubleshooting Figure 50 ECM fan powered with single phase voltage electric heat...
Страница 86: ...86 VAV SVX01C EN Troubleshooting Figure 51 ECM fan powered with three phase voltage electric heat...