36
SS-SVX09A-EN
Installation
Evaporator Piping
1.
Install the TXV directly to the unit liquid connection.
2. Locate the TXV bulb midway between the 90 degrees bends on top of the suction line as
illustrated in
Figure 19
and
Figure 20
.
3. Secure the bulb to the suction line with two clamps provided by the manufacturer and insulate
the bulb.
4. Install the Frostat™ according to the instructions enclosed in the kit as close to the evaporator
as possible.
Figure 19. Typical Coil Piping For Dual Circuit Units
Figure 20. Typical Coil Piping For Dual Circuit Units
Содержание RAUC-C20
Страница 10: ...10 SS SVX09A EN Installation Figure 3 RAUC C20 Unit Dimensional Data Recommended Clearances...
Страница 11: ...SS SVX09A EN 11 Installation Figure 4 RAUC C25 Unit Dimensional Data Recommended Clearances...
Страница 12: ...12 SS SVX09A EN Installation Figure 5 RAUC C30 Unit Dimensional Data Recommended Clearances...
Страница 13: ...SS SVX09A EN 13 Installation Figure 6 RAUC C40 Unit Dimensional Data Recommended Clearances...
Страница 14: ...14 SS SVX09A EN Installation Figure 7 RAUC C50 Unit Dimensional Data Recommended Clearances...
Страница 15: ...SS SVX09A EN 15 Installation Figure 8 RAUC C60 Unit Dimensional Data Recommended Clearances...
Страница 55: ...SS SVX09A EN 55 Installation Field Connection Diagram Notes for all System Control Options...
Страница 67: ...SS SVX09A EN 67 Installation Figure 33 6RT1 Discharge Air Sensor Assembly...
Страница 96: ...96 SS SVX09A EN System Start Up Figure 47 20 Ton Pressure Curve...
Страница 97: ...SS SVX09A EN 97 System Start Up Figure 48 25 Ton Pressure Curve...
Страница 98: ...98 SS SVX09A EN System Start Up Figure 49 30Ton Pressure Curve...
Страница 99: ...SS SVX09A EN 99 System Start Up Figure 50 40 Ton Pressure Curve per Circuit...
Страница 100: ...100 SS SVX09A EN System Start Up Figure 51 50 Ton Pressure Curve per Circuit...
Страница 101: ...SS SVX09A EN 101 System Start Up Figure 52 60 Ton Pressure Curve per Circuit...