Installation
General Unit Requirements
The checklist listed below is a summary of the steps required to successfully install a commercial
air cooled condenser. This checklist is intended to acquaint the installing personnel with what is
required in the installation process. It does not replace the detailed instruction called out in the
applicable sections of this manual.
[ ] Verify that the power supply complies with the unit nameplate specifications.
[ ] Check the unit for shipping damage and material shortage; file a freight claim and notify Trane
office.
[ ] Verify that the installation location of the unit will provide the required clearance for proper
operation.
[ ] Install appropriate isolators, if required.
Refrigerant Piping Requirements
[ ] Install properly sized liquid line(s) between the liquid line connections on the unit and the
evaporator, (i.e., DX evaporator or an EVP Chiller). Refer to the “Refrigerant Piping” section for
recommended line components and guidelines.
[ ] Install a properly sized liquid line isolation solenoid valve in each liquid line.
[ ] Install refrigerant rated shutoff valves in the liquid line(s) to isolate the filter drier(s) for service.
[ ] Install a properly sized filter drier in each liquid line.
[ ] Install a properly sized filter in each suction line.
[ ] Install properly sized suction line(s) between the suction line connections on the unit and the
evaporator, (i.e., DX evaporator or an EVP Chiller). Refer to the “Refrigerant Piping” section for
recommended line components and guidelines.
[ ] Install properly sized hot gas bypass line(s) between the hot gas bypass connections on the unit
and the evaporator, (i.e., EVP Chiller, if applicable).
[ ] Insulate the suction line.
Figure 16. Removing Scroll Compressor Shipping Hardware for 20 through 60 Ton Units
Содержание RAUC-C20
Страница 10: ...10 SS SVX09A EN Installation Figure 3 RAUC C20 Unit Dimensional Data Recommended Clearances...
Страница 11: ...SS SVX09A EN 11 Installation Figure 4 RAUC C25 Unit Dimensional Data Recommended Clearances...
Страница 12: ...12 SS SVX09A EN Installation Figure 5 RAUC C30 Unit Dimensional Data Recommended Clearances...
Страница 13: ...SS SVX09A EN 13 Installation Figure 6 RAUC C40 Unit Dimensional Data Recommended Clearances...
Страница 14: ...14 SS SVX09A EN Installation Figure 7 RAUC C50 Unit Dimensional Data Recommended Clearances...
Страница 15: ...SS SVX09A EN 15 Installation Figure 8 RAUC C60 Unit Dimensional Data Recommended Clearances...
Страница 55: ...SS SVX09A EN 55 Installation Field Connection Diagram Notes for all System Control Options...
Страница 67: ...SS SVX09A EN 67 Installation Figure 33 6RT1 Discharge Air Sensor Assembly...
Страница 96: ...96 SS SVX09A EN System Start Up Figure 47 20 Ton Pressure Curve...
Страница 97: ...SS SVX09A EN 97 System Start Up Figure 48 25 Ton Pressure Curve...
Страница 98: ...98 SS SVX09A EN System Start Up Figure 49 30Ton Pressure Curve...
Страница 99: ...SS SVX09A EN 99 System Start Up Figure 50 40 Ton Pressure Curve per Circuit...
Страница 100: ...100 SS SVX09A EN System Start Up Figure 51 50 Ton Pressure Curve per Circuit...
Страница 101: ...SS SVX09A EN 101 System Start Up Figure 52 60 Ton Pressure Curve per Circuit...