![Trane RAUC-C20 Скачать руководство пользователя страница 75](http://html1.mh-extra.com/html/trane/rauc-c20/rauc-c20_installation-operation-and-maintenance_1149481075.webp)
SS-SVX09A-EN
75
System Pre-Start Procedures
EVP Chiller Control Checkout (Honeywell W7100G)
Note:
The following checkout procedure must be performed in its entirety and in the sequence
given.
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote disconnects before servicing. Follow proper
lockout/tagout procedures to ensure the power can not be inadvertently energized. Failure to
disconnect power before servicing could result in death or serious injury.
The W7100G (6U11) chilled water controller can be checked out using a highly accurate digital volt-
ohmmeter, the W7100 accessory tool kit (Trane part # TOL-0101 or Honeywell part # 4074EDJ), and
the Honeywell 4074EFV resistor bag assembly.
1.
Verify that the main power disconnect switch and the control circuit switch 1S2, in the unit
control panel, is “OFF”.
2. At the unit control panel, unplug the reset relay 1K11 and 1K12, (1K12 used on 40 through 60
Ton units only). Refer to the connection diagram that shipped with the unit for the location of
the relay(s).
3. At the Chilled Water controller (6U11) inside the remote panel, disconnect the sensor (6RT2)
leads form Terminals T & T1.
4. Remove the 3,400 ohm resistor (blue leads) from the test kit and connect it across Terminals T
and T1 to simulate a discharge air temperature of 60ºF.
5. Remove the factory-installed jumper (wire 209A) from the “fast response” Terminals 9 & 10.
6. To simulate a call for maximum reset, remove the jumper from Terminals 6 & 7 and install the
1780 ohm resistor (red leads), from the test kit, across Terminals 6 and 7.
7.
Install a jumper across the P1 and P2 Terminals (remote setpoint input).
8. Remove the red dust cover from the test plug socket at the bottom of the W7100G. Insert the
“Test Plug”, from the kit, into the test plug socket. The test plug overrides most of the built-in
time delays for staging the compressors “On” and “Off”. Refer to the illustration in
Figure 38
for
terminal and control dial identification.
9. Set the “Reset F” dial at 20ºF and the “Setpoint F” dial at 10ºF
Figure 37. Discharge Duct Sensor 6RT2 & 6RT3 “Temperature vs Resistance” Curve
3000
3200
3400
3600
3800
4000
4200
20
40
60
80
100
120
140
160
180
200
220
Temperature -
O
F (
O
C)
Resi
st
an
ce (
O
h
ms)
(-6.7
o
C) (4.4
o
C) (15.6
o
C) (26.7
o
C) (37.8
o
C) (48.9
o
C) (60.0
o
C) (71.1
o
C) (82.2
o
C) (93.3
o
C) (104.4
o
C)
3483 ± 10 Ohms @
77
O
F (25
O
C)
Содержание RAUC-C20
Страница 10: ...10 SS SVX09A EN Installation Figure 3 RAUC C20 Unit Dimensional Data Recommended Clearances...
Страница 11: ...SS SVX09A EN 11 Installation Figure 4 RAUC C25 Unit Dimensional Data Recommended Clearances...
Страница 12: ...12 SS SVX09A EN Installation Figure 5 RAUC C30 Unit Dimensional Data Recommended Clearances...
Страница 13: ...SS SVX09A EN 13 Installation Figure 6 RAUC C40 Unit Dimensional Data Recommended Clearances...
Страница 14: ...14 SS SVX09A EN Installation Figure 7 RAUC C50 Unit Dimensional Data Recommended Clearances...
Страница 15: ...SS SVX09A EN 15 Installation Figure 8 RAUC C60 Unit Dimensional Data Recommended Clearances...
Страница 55: ...SS SVX09A EN 55 Installation Field Connection Diagram Notes for all System Control Options...
Страница 67: ...SS SVX09A EN 67 Installation Figure 33 6RT1 Discharge Air Sensor Assembly...
Страница 96: ...96 SS SVX09A EN System Start Up Figure 47 20 Ton Pressure Curve...
Страница 97: ...SS SVX09A EN 97 System Start Up Figure 48 25 Ton Pressure Curve...
Страница 98: ...98 SS SVX09A EN System Start Up Figure 49 30Ton Pressure Curve...
Страница 99: ...SS SVX09A EN 99 System Start Up Figure 50 40 Ton Pressure Curve per Circuit...
Страница 100: ...100 SS SVX09A EN System Start Up Figure 51 50 Ton Pressure Curve per Circuit...
Страница 101: ...SS SVX09A EN 101 System Start Up Figure 52 60 Ton Pressure Curve per Circuit...