Piping
CLCH-SVX08C-EN
17
Piping
Gas Piping
Note:
Installation must conform with the American
National Standard Z223.1 (NFPA 54), the National
Fuel Gas Code, latest edition, in the absence of local
codes.
•
Gas piping should always be done in accordance with
local codes.
•
Tighten all joints securely.
•
Pipe unions should be a “ground joint” type to prevent
leakage.
•
Provide adequate support for field-installed piping to
avoid placing stress on the gas train and controls.
•
Run takeoff lines from the side or top of the main gas
line to prevent moisture from being drawn into the gas
train of the unit.
•
Provide a drip leg in the field-installed piping, installing
it near the unit.
•
acceptable piping penetration locations.
Figure 12.
Leaving air side (tube or secondary) of gas
heat section
WARNING
Hazard of Explosion and Deadly Gases!
Never solder, braze or weld on refrigerant lines or any
unit components that are above atmospheric pressure
or where refrigerant may be present. Always remove
refrigerant by following the guidelines established by
the EPA Federal Clean Air Act or other state or local
codes as appropriate. After refrigerant removal, use dry
nitrogen to bring system back to atmospheric pressure
before opening system for repairs. Mixtures of
refrigerants and air under pressure may become
combustible in the presence of an ignition source
leading to an explosion. Excessive heat from soldering,
brazing or welding with refrigerant vapors present can
form highly toxic gases and extremely corrosive acids.
Failure to follow all proper safe refrigerant handling
practices could result in death or serious injury.
Figure 13.
Gas heat internal piping penetration location
Combustion Air Inlet
Shaded area is "OK" for gas inlet pipe
Do not install gas pipe in access door or combustion air inlet
Access
Door
Access
Door
Flue
Internal Vestibule
Содержание K01K12345
Страница 21: ...Wiring CLCH SVX08C EN 21 Figure 16 Natural gas 200 320 MBh 10 1 turndown...
Страница 22: ...Wiring 22 CLCH SVX08C EN Figure 17 Natural gas 360 1000 MBh 3 1 and 10 1 turndown and propane 200 1000 MBh...
Страница 23: ...Wiring CLCH SVX08C EN 23 Figure 18 Single phase natural gas and propane 1250 2000 MBh 3 1 and 10 1 turndown...
Страница 25: ...Wiring CLCH SVX08C EN 25 Figure 20 Natural gas and propane1250 2400 MBh 20 1 turndown...
Страница 34: ......
Страница 35: ......