Start Up
30
CLCH-SVX08C-EN
Seasonal Startup
When heating system is to be started for first time in the
season:
1. Disconnect electrical power.
2. If the heat exchanger does not have a p-trap and
condensate drain line, connect a hose to the drain
valve and drain any accumulated condensate.
3. Check all electrical terminals for tight connections.
4. Open all manual gas valves and ensure that these
valves operate freely.
5. Check the air shutter and modulating gas valve
linkages for tightness.
6. Clean dust, dirt, and debris from the air shutters on the
combustion fan and the air inlet louver.
7. Check the exhaust flue for debris and clean as
necessary.
8. Re-connect the power and initiate the startup
sequence.
Содержание K01K12345
Страница 21: ...Wiring CLCH SVX08C EN 21 Figure 16 Natural gas 200 320 MBh 10 1 turndown...
Страница 22: ...Wiring 22 CLCH SVX08C EN Figure 17 Natural gas 360 1000 MBh 3 1 and 10 1 turndown and propane 200 1000 MBh...
Страница 23: ...Wiring CLCH SVX08C EN 23 Figure 18 Single phase natural gas and propane 1250 2000 MBh 3 1 and 10 1 turndown...
Страница 25: ...Wiring CLCH SVX08C EN 25 Figure 20 Natural gas and propane1250 2400 MBh 20 1 turndown...
Страница 34: ......
Страница 35: ......