Installation (Continued)
Requirements for Steam Heat (SSH_)
[ ] Install an automatic air vent at the top of the return water
coil header.
[ ] Route properly sized steam piping through the base of
the unit into the heating section.
[ ] Install the factory-supplied, 2-way modulating valve
[ ] Complete the valve actuator wiring.
[ ] Install 1/2", 15-degree swing-check vacuum breaker(s) at
the top of each coil section. Vent breaker(s) to theatmo-
sphere or merge with return main at discharge side of
steam trap.
[ ] Position the steam trap discharge at least 12" below the
outlet connection on the coil.
[ ] Use float and thermostatic traps in the system, as re-
quired by the application.
O/A Pressure Sensor and Tubing Installation
(All units with Statitrac)
[ ] O/A pressure sensor mounted to the roof bracket.
[ ] Factory supplied pneumatic tubing installed between the
O/A pressure sensor and the connector on the vertical
support.
[ ] Field supplied pneumatic tubing connected to the proper
fitting on the space pressure transducer located in the
filter section, and the other end routed to a suitable sens-
ing location within the controlled space.
Figure 3-6A
Condensate Drain Locations
Содержание INTELLIPAK RT-SVX10C-EN
Страница 16: ...15 Figure 3 1 Minimum Operation and Service Clearances for Single Multiple Unit Installation...
Страница 17: ...16 Figure 3 2A SAHF Cooling Only Units 20 thru 75 Ton...
Страница 19: ...18 Figure 3 2B SEHF SFHF SLHF SSHF SXHF Units 20 thru 75 Ton...
Страница 21: ...20 Figure 3 2C S_HG Cooling Heating Units 90 through 130 Ton...
Страница 25: ...24 Figure 3 4 Typical Unit Rigging Figure 3 5 Unit Base Roof Curb Section...
Страница 38: ...37 Figure 3 13 Steam Coil Piping 20 through 30 Ton Units Steam Coil Piping 40 through 130 Ton Units...
Страница 41: ...40 Figure 3 14 Continued Typical Field Power Wiring 90 thru 130 Ton Table 3 6 Customer Connection Wire Range...
Страница 52: ...51 Field Connection Diagram Notes for 20 through 130 Ton CV or VAV Applications...
Страница 86: ...84 Figure 4 6 Compressor Locations...
Страница 103: ...101 Service Maintenance Continued Table 5 3 Unit Internal Fuse Replacement Data VFD Factory Settings...
Страница 117: ...115...
Страница 118: ...116...