
RT-SVX072A-EN
45
Figure 23.
Ultra modulating gas train for 500 to 850
MBh
Ratio Regulator
To Combustion
Air Sensor
Main Gas
Regulator
Manual Shut-off
Valve
1" Field
Elbow Connection
Pilot Pressure
Regulator
Pilot Solenoid
Valve
Connections
into Burner
Box
Manual
Shut-off
Valve
Burner
Gas Manifold
Main Gas
Solenoid
Valves
Figure 24.
Ultra modulating 1000 MBh
Manual
shut-off
valve
Ratio
regulator
Pilot
solenoid
valve
Pilot
pressure
regulator
Manual
shut-off
valve
Main gas
regulator
To combustion
air sensor
Main gas
solenoid
valves
Burner
gas
manifold
1 1/4”
field elbow
connection
Connection
into burner
box
Flue Assembly Installation
1. Locate the flue assembly and the extension (refer to
for extension usage) in the ship
with section of the unit.
2. Install the flue extension onto the flue assembly as
shown in
3. Slide the pipe clamp onto the heater flue tube
located inside the heater compartment.
4. Insert the tube on the flue assembly into the hole
located in the vertical support for the heat section.
5. Butt both tube sections together and center the pipe
clamp over joint.
6. Using the pre-punch holes in the flue assembly,
extension, and the vertical support, install the
appropriate number of mounting brackets (Refer to
the installation instructions that ship with the flue
assembly.)
Figure 25.
Flue assembly
Flue Extension
(20-25 Ton N/A)
(30 Ton 13” Long)
(40, 60, 70, 75 Ton 25” Long)
(50-55 Ton 37” Long)
(90-130 Ton 37” Long)
Vent Cap
Assembly
Heat Section
Vertical Support
Flue Tube
Pipe Clamp
Mounting Brackets
(20-25 Ton (1))
(30 Ton (2))
(40-130 Ton (4))
General Coil Piping and
Connection Recommendations
Proper installation, piping, and trapping is necessary to
ensure satisfactory coil operation and to prevent
operational damage:
N
No
otte
e:: The contractor is responsible for supplying the
installation hardware.
☐
Support all piping independently of the coils.
☐
Provide swing joints or flexible fittings on all
connections that are adjacent to heating coils to
absorb thermal expansion and contraction strains.
☐
Install factory supplied control valves (valves ship
separately).
N
NO
OT
TIIC
CE
E
C
Co
on
nn
ne
eccttiio
on
n L
Le
ea
akkss!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d
rre
essu
ulltt iin
n d
da
am
ma
ag
ge
e tto
o tth
he
e cco
oiill h
he
ea
ad
de
err a
an
nd
d cca
au
usse
e
cco
on
nn
ne
eccttiio
on
n lle
ea
akkss..
U
Usse
e a
a b
ba
acckku
up
p w
wrre
en
ncch
h w
wh
he
en
n a
atttta
acch
hiin
ng
g p
piip
piin
ng
g tto
o
cco
oiillss w
wiitth
h cco
op
pp
pe
err h
he
ea
ad
de
errss.. D
Do
o n
no
ott u
usse
e b
brra
assss
cco
on
nn
ne
ecctto
orrss b
be
ecca
au
usse
e tth
he
ey
y d
diisstto
orrtt e
ea
assiilly
y..
☐
When attaching the piping to the coil header, make
the connection only tight enough to prevent leaks.
Maximum recommended torque is 200 foot-
pounds.
Содержание IntelliPak 1
Страница 134: ...134 RT SVX072A EN Figure 108 Dry bulb changeover map T Tr ra an ne e S St ta ar rt tu up p C Ch he ec ck kl li is st t ...
Страница 161: ...RT SVX072A EN 161 N No ot te es s ...
Страница 162: ...162 RT SVX072A EN N No ot te es s ...
Страница 163: ...RT SVX072A EN 163 N No ot te es s ...