
16
RT-SVX072A-EN
☐
Install the factory-supplied, 3-way modulating
valve.
☐
Complete the valve actuator wiring.
Requirements for Steam Heat (SSH_)
☐
Install an automatic air vent at the top of the return
water coil header.
☐
Route properly sized steam piping through the base
of the unit into the heating section.
☐
Install the factory-supplied, 2-way modulating
valve.
☐
Complete the valve actuator wiring.
☐
Install 1/2", 15-degree swing check vacuum breaker
(s) at the top of each coil section. Vent breaker(s) to
the atmosphere or merge with return main at
discharge side of steam trap.
☐
Position the steam trap discharge at least 12" below
the outlet connection on the coil.
☐
Use float and thermostatic traps in the system, as
required by the application.
O/A Pressure Sensor and Tubing
Installation (All units with Statitrac or
Return Fans)
☐
O/A pressure sensor mounted to the roof bracket.
☐
Factory supplied pneumatic tubing installed
between the O/A pressure sensor and the connector
on the vertical support.
☐
(Units with StatiTrac) Field supplied pneumatic
tubing connected to the proper fitting on the space
pressure transducer located in the filter section, and
the other end routed to a suitable sensing location
within the controlled space.
Requirements for Modulating Reheat
☐
Install space humidity and temperature sensors.
Refer to unit diagrams for guidelines.
Содержание IntelliPak 1
Страница 134: ...134 RT SVX072A EN Figure 108 Dry bulb changeover map T Tr ra an ne e S St ta ar rt tu up p C Ch he ec ck kl li is st t ...
Страница 161: ...RT SVX072A EN 161 N No ot te es s ...
Страница 162: ...162 RT SVX072A EN N No ot te es s ...
Страница 163: ...RT SVX072A EN 163 N No ot te es s ...