S
SA
AF
FE
ET
TY
Y W
WA
AR
RN
NIIN
NG
G
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and
air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered
equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the
literature and on the tags, stickers, and labels that are attached to the equipment.
May 2017
M
MU
UA
A--S
SV
VX
X0
00
05
5B
B--E
EN
N
Indoor Make-Up Air Unit Arrangements
For Heating, Cooling, and Ventilating Systems
M
Mo
od
de
ellss::
GGAA
GGBA
GZAA
GZBA
Installation, Operation,
and Maintenance
Содержание GGAA
Страница 35: ...MUA SVX005B EN 35 Figure 12 Blower RPM Adjustment M Ma ai in nt te en na an nc ce e ...
Страница 47: ...MUA SVX005B EN 47 Motor Electric Data Table 7 Full Load Current in Amperes ...
Страница 50: ...50 MUA SVX005B EN Coil Cabinet Dimensional Data Figure 13 Coil Cabinet Dimensional Data ...
Страница 57: ...MUA SVX005B EN 57 Gas Equipment Start Up ...
Страница 58: ...58 MUA SVX005B EN N No ot te es s ...
Страница 59: ...MUA SVX005B EN 59 N No ot te es s ...