32
MUA-SVX005B-EN
4. Complete appropriate start-up procedure as given in the
Start-Up
section of this manual.
5. Check Burner Adjustment.
6. Check gas control valves and pipe connection for leaks.
W
WA
AR
RN
NIIN
NG
G
C
Co
om
mb
bu
ussttiib
blle
e M
Ma
atte
erriia
allss!!
F
Fa
aiillu
urre
e tto
o m
ma
aiin
ntta
aiin
n p
prro
op
pe
err cclle
ea
arra
an
ncce
e b
be
ettw
we
ee
en
n tth
he
e u
un
niitt a
an
nd
d cco
om
mb
bu
ussttiib
blle
e m
ma
atte
erriia
allss cco
ou
ulld
d
cca
au
usse
e a
a ffiirre
e w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y o
orr p
prro
op
pe
errtty
y d
da
am
ma
ag
ge
e..
R
Re
effe
err tto
o u
un
niitt n
na
am
me
ep
plla
atte
e a
an
nd
d iin
nsstta
alllla
attiio
on
n iin
nssttrru
uccttiio
on
nss ffo
orr p
prro
op
pe
err cclle
ea
arra
an
ncce
ess..
7. Check operation of auto gas valve.
8. Check operation of safety devices.
9. Inspect and service blower section of system.
Seasonal Maintenance
The unit should be thoroughly checked before the start and at the end of each heating and
cooling season:
1. Motors and belts should be inspected.
2. Tighten belts if loose.
3. Check and clean DX or Chilled Water coil twice yearly, if unit is so equipped per
manufacturer’s service manual. Chilled Water coil must be winterized at beginning of heating
season (i.e. drain water from coil per manufacturer’s instructions).
4. Check air throughput at beginning of heating season to confirm unit operation is within the
specified temperature rise range.
5. At beginning of heating season clear Condensate Drain Pan and P-trap of water if unit is
equipped with DX or Chilled water coil. Clean out drain pan and fill P-trap with a non-toxic
glycol solution.
6. Evaporative cooler must be cleaned and maintained per manufacturer’s instruction
frequently during the operating season.
7. Inspect Control Dampers during periodic maintenance. Damper pivot points should be
cleaned to ensure free damper operation.
8. Blower wheels should be checked periodically for dirt build-up on blades. Clean as required.
Filters
•
The filter section has been designed to incorporate (as standard) one-inch washable filters.
Other optional filter types are also available: two-inch washable throwaways; or one or two
inch hi-efficiency 30% pleated filters.
•
It is recommended that air filters be changed or cleaned at least four times a year. More
frequent attention to filters is required if the air being handled by the unit is unusually dirty.
Air flow reduction, caused by the dirty air filters, will increase the discharge air temperature
and may cause unit cycling on the primary limit.
•
Filters (by others) should be serviced regularly and changed or washed when necessary to
maintain the required air throughput. In a dusty environment, filters may clog up in less than
one month.
Table 3. Standard CFM Blower Air Filter Size Requirements
Unit Input
Number of Filters Required
16 x 20 (in)
20 x 20 (in)
100 MBtuh (29.3 kW)
4
150 MBtuh (44.0 kW)
4
M
Ma
aiin
ntte
en
na
an
ncce
e
Содержание GGAA
Страница 35: ...MUA SVX005B EN 35 Figure 12 Blower RPM Adjustment M Ma ai in nt te en na an nc ce e ...
Страница 47: ...MUA SVX005B EN 47 Motor Electric Data Table 7 Full Load Current in Amperes ...
Страница 50: ...50 MUA SVX005B EN Coil Cabinet Dimensional Data Figure 13 Coil Cabinet Dimensional Data ...
Страница 57: ...MUA SVX005B EN 57 Gas Equipment Start Up ...
Страница 58: ...58 MUA SVX005B EN N No ot te es s ...
Страница 59: ...MUA SVX005B EN 59 N No ot te es s ...