MUA-SVX005B-EN
29
3. Place the system switch in the ON position.
N
No
otte
e:: With the thermostat calling for cooling, unit operation is automatic.
F
Fiin
na
all C
Ch
he
ecckko
ou
utt
Run the unit sequentially through its stages of heating and cooling. Once proper unit operation is
verified, perform these final steps:
1. Inspect unit for debris and/or misplaced tools and hardware.
2. Be sure all gas valves and controls are in the operating position if the unit will be operating
immediately.
3. Cycle unit on all safety controls to verify proper unit operation.
4. Confirm proper operating control (thermostat or ductstat) operation by cycling unit.
5. Secure all exterior panels in place.
S
Stta
arrtt--U
Up
p
Содержание GGAA
Страница 35: ...MUA SVX005B EN 35 Figure 12 Blower RPM Adjustment M Ma ai in nt te en na an nc ce e ...
Страница 47: ...MUA SVX005B EN 47 Motor Electric Data Table 7 Full Load Current in Amperes ...
Страница 50: ...50 MUA SVX005B EN Coil Cabinet Dimensional Data Figure 13 Coil Cabinet Dimensional Data ...
Страница 57: ...MUA SVX005B EN 57 Gas Equipment Start Up ...
Страница 58: ...58 MUA SVX005B EN N No ot te es s ...
Страница 59: ...MUA SVX005B EN 59 N No ot te es s ...