Upflow/ Horizontal, Downflow/ Horizontal,
Gas-Fired, Direct Vent Condensing
Furnaces
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT —
This Document is
customer property
and is to remain with this unit.
Please return to service information pack upon completion of work.
Installer’s Guide
*__First letter may be “A” or “T”
1 8 - C D 2 9 D 1 - 3
UPFLOW
*UH1
UPFLOW/HORIZONTAL
A341624P13
*UH1
*UH1B040A9241A
*UH1B060A9361A
*UH1B080A9421A
*UH1C080A9601A
*UH1C100A9481A
*UH1D100A9601A
*UH1D120A9601A
*DH1B040A9241A
*DH1B065A9421A
*DH1C085A9481A
*DH1D110A9601A
*DH1
DOWNFLOW
DOWNFLOW/HORIZONTAL
*DH1
Содержание *DH1B040A9241A
Страница 38: ...38 18 CD29D1 3 Installer s Guide...