background image

20

CVHE-SVN04M-EN

Disassembly

Remove Nitrogen Charge

W

WA

AR

RN

NIIN

NG

G

R

Re

effrriig

ge

erra

an

ntt M

Ma

ay

y B

Be

e U

Un

nd

de

err P

Po

ossiittiiv

ve

e

P

Prre

essssu

urre

e!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

a

an

n e

ex

xp

pllo

ossiio

on

n w

wh

hiicch

h cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y o

orr e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e..

S

Sy

ysstte

em

m cco

on

ntta

aiin

nss rre

effrriig

ge

erra

an

ntt a

an

nd

d m

ma

ay

y b

be

e u

un

nd

de

err

p

po

ossiittiiv

ve

e p

prre

essssu

urre

e;; ssy

ysstte

em

m m

ma

ay

y a

allsso

o cco

on

ntta

aiin

n o

oiill..

R

Re

ecco

ov

ve

err rre

effrriig

ge

erra

an

ntt tto

o rre

elliie

ev

ve

e p

prre

essssu

urre

e b

be

effo

orre

e

o

op

pe

en

niin

ng

g tth

he

e ssy

ysstte

em

m.. S

Se

ee

e u

un

niitt n

na

am

me

ep

plla

atte

e ffo

orr

rre

effrriig

ge

erra

an

ntt tty

yp

pe

e.. D

Do

o n

no

ott u

usse

e n

no

on

n--a

ap

pp

prro

ov

ve

ed

d

rre

effrriig

ge

erra

an

nttss,, rre

effrriig

ge

erra

an

ntt ssu

ub

bssttiittu

utte

ess,, o

orr n

no

on

n--

a

ap

pp

prro

ov

ve

ed

d rre

effrriig

ge

erra

an

ntt a

ad

dd

diittiiv

ve

ess..

N

NO

OT

TIIC

CE

E

E

Eq

qu

uiip

pm

me

en

ntt D

Da

am

ma

ag

ge

e!!

M

Miix

xiin

ng

g rre

effrriig

ge

erra

an

nttss o

orr o

oiillss cco

ou

ulld

d rre

essu

ulltt iin

n

e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e iin

nccllu

ud

diin

ng

g b

be

ea

arriin

ng

g d

da

am

ma

ag

ge

e,,

iin

nttrro

od

du

uccttiio

on

n o

off a

acciid

dss iin

ntto

o tth

he

e cch

hiilllle

err,, o

orr cco

on

nttiin

nu

uo

ou

uss

p

pu

urrg

ge

e p

pu

um

mp

p--o

ou

utt iin

n h

hiig

gh

h--h

he

ea

ad

d//h

hiig

gh

h a

am

mb

biie

en

ntt

a

ap

pp

plliicca

attiio

on

nss..

C

Ce

en

nT

Trra

aV

Va

acc cch

hiilllle

errss a

arre

e m

ma

an

nu

uffa

accttu

urre

ed

d w

wiitth

h

d

diiffffe

erre

en

ntt rre

effrriig

ge

erra

an

ntt//o

oiill ssy

ysstte

em

mss:: 1

1)) cch

hiilllle

errss u

ussiin

ng

g

R

R--1

12

23

3 rre

effrriig

ge

erra

an

ntt a

an

nd

d O

OIIL

L0

00

00

02

22

2 cco

om

mp

prre

esssso

orr o

oiill,,

a

an

nd

d 2

2)) cch

hiilllle

errss u

ussiin

ng

g R

R--5

51

14

4A

A rre

effrriig

ge

erra

an

ntt a

an

nd

d

O

OIIL

L0

00

03

33

34

4//O

OIIL

L0

00

03

33

35

5 cco

om

mp

prre

esssso

orr o

oiill..

V

Ve

erriiffy

y p

prro

op

pe

err rre

effrriig

ge

erra

an

ntt a

an

nd

d o

oiill ffo

orr y

yo

ou

urr cch

hiilllle

err

a

an

nd

d d

do

o N

NO

OT

T m

miix

x rre

effrriig

ge

erra

an

nttss o

orr o

oiillss!!

This

Installation Guide

applies to CenTraVac

chillers

with two different refrigerant and oil systems:

R-123 and OIL00022

R-514A and OIL00334/OIL00335

IIm

mp

po

orrtta

an

ntt:: Verify proper refrigerant and oil for your

chiller before proceeding!

N

No

otte

e:: This manual applies to model CDHF, CDHG,

CVHE, CVHF, and CenTraVac chillers.

IIm

mp

po

orrtta

an

ntt:: Remove the nitrogen charge from the

chiller vessel before starting any
disassembly procedures.

N

No

otte

e:: New units ship with a 5 psig (34.5 kPag) dry

nitrogen holding charge at nominal 72°F (22°C).

IIm

mp

po

orrtta

an

ntt:: New units that have been factory run-tested

contain residual refrigerant; vent discharge
outdoors.

Check to make sure there is a positive pressure holding
charge.

Introduction

The disassembly and reassembly procedures described
in this manual should be performed only on chillers
that have been ordered with this shell option. The
process is to be initiated by experienced service
technicians. Contact your local Trane Service office for
assistance if required.

This section discusses a typical disassembly process.
Proper lifting techniques vary based on mechanical
room layout.

It is the responsibility of the person(s) performing
the work to be properly trained in the safe practice
of rigging, lifting, securing, and fastening the
components involved.

It is the responsibility of the person(s) providing
and using the rigging and lifting devices to inspect
these devices to ensure they are free from defect
and are rated to meet or exceed the published
weights.

Always use rigging and lifting devices in
accordance with the applicable instructions for such
devices.

N

No

otte

e:: Additional gaskets and O-rings are shipped with

the chiller when compressor doweling and/or
separable shells are selected.

W

WA

AR

RN

NIIN

NG

G

H

He

ea

av

vy

y O

Ob

bjje

ecctt!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

u

un

niitt d

drro

op

pp

piin

ng

g w

wh

hiicch

h cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y,, a

an

nd

d e

eq

qu

uiip

pm

me

en

ntt o

orr p

prro

op

pe

errtty

y--o

on

nlly

y

d

da

am

ma

ag

ge

e..

E

En

nssu

urre

e tth

ha

att a

allll tth

he

e lliiffttiin

ng

g e

eq

qu

uiip

pm

me

en

ntt u

usse

ed

d iiss

p

prro

op

pe

errlly

y rra

atte

ed

d ffo

orr tth

he

e w

we

eiig

gh

htt o

off tth

he

e u

un

niitt b

be

eiin

ng

g

lliifftte

ed

d.. E

Ea

acch

h o

off tth

he

e cca

ab

blle

ess ((cch

ha

aiin

nss o

orr sslliin

ng

gss)),, h

ho

oo

okkss,,

a

an

nd

d ssh

ha

acckklle

ess u

usse

ed

d tto

o lliifftt tth

he

e u

un

niitt m

mu

usstt b

be

e cca

ap

pa

ab

blle

e

o

off ssu

up

pp

po

orrttiin

ng

g tth

he

e e

en

nttiirre

e w

we

eiig

gh

htt o

off tth

he

e u

un

niitt.. L

Liiffttiin

ng

g

cca

ab

blle

ess ((cch

ha

aiin

nss o

orr sslliin

ng

gss)) m

ma

ay

y n

no

ott b

be

e o

off tth

he

e ssa

am

me

e

lle

en

ng

gtth

h.. A

Ad

djju

usstt a

ass n

ne

ecce

essssa

arry

y ffo

orr e

ev

ve

en

n u

un

niitt lliifftt..

N

NO

OT

TIIC

CE

E

E

Eq

qu

uiip

pm

me

en

ntt D

Da

am

ma

ag

ge

e!!

F

Fa

aiillu

urre

e tto

o rre

em

mo

ov

ve

e tth

he

e ssttrra

aiin

n rre

elliie

eff w

wiitth

h tth

he

e sse

en

nsso

orr

cco

ou

ulld

d rre

essu

ulltt iin

n e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e..

D

Do

o N

NO

OT

T a

atttte

em

mp

ptt tto

o p

pu

ullll sse

en

nsso

orr b

bu

ullb

b tth

hrro

ou

ug

gh

h tth

he

e

ssttrra

aiin

n rre

elliie

eff;; a

allw

wa

ay

yss rre

em

mo

ov

ve

e tth

he

e e

en

nttiirre

e ssttrra

aiin

n rre

elliie

eff

w

wiitth

h tth

he

e sse

en

nsso

orr..

Wiring Disassembly

Before separating shells, remove the purge, the
compressor, and the various unit mounted sensors
(frame LLIDs) as indicated. If possible, the best method

Содержание CenTraVac CDHF

Страница 1: ...knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the...

Страница 2: ...th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y T Te ec ch hn ni ic ci ia an...

Страница 3: ...11 Factory Warranty Information Compliance with the following is required to preserve the factory warranty A Al ll l U Un ni it t I In ns st ta al ll la at ti io on ns s Startup MUST be performed by...

Страница 4: ...ta an nt t These procedures do NOT apply to units that have been installed and electrical supply wiring has been completed Contractor Responsibilities W WA AR RN NI IN NG G H He ea av vy y O Ob bj je...

Страница 5: ...pass INDP Optional industrial control package SMP Optional supplemental motor protection INDP units only UAFD Unit mounted Adaptive Frequency drive UATR Unit mounted medium voltage auto transformer UP...

Страница 6: ...42 0 78 3 51 3 59 1 93 8 45 5 62 2 63 5 44 3 620 870 080 870 93 5 75 0 101 3 42 0 81 2 59 7 73 2 93 8 45 5 63 9 63 5 44 3 080 142 870 101 3 79 4 107 5 a 81 3 59 7 73 2 102 0 45 5 67 9 63 59 46 0 142...

Страница 7: ...102 0 45 5 64 3 63 59 46 0 142 920 98 1 84 0 111 0 a 93 2 54 3 68 0 105 5 46 9 69 8 62 5 46 0 142 210 920 106 0 89 7 109 7 a 93 3 54 6 68 7 105 4 46 9 76 2 62 5 52 4 210 920 106 5 96 0 116 0 a 93 2 54...

Страница 8: ...21 1 36 8 126 9 129 0 N A N A 72 7 210 1300 93 8 76 4 86 9 N A 21 1 36 8 124 7 135 2 87 2 87 2 82 4 250 1300 97 9 80 4 90 9 N A 18 6 36 8 137 2 139 4 N A N A 82 7 1470 1720 142 210 1720 86 5 72 8 83 3...

Страница 9: ...9 77 5 N A 146 0 91 0 4 6 142 210 1300 a a a a 147 9 83 6 3 5 154 9 90 6 5 6 210 1300 a a a a N A N A N A 152 4 95 9 3 9 250 1300 140 7 b 80 2 a N A N A N A 160 0 99 5 3 1 1470 1720 142 210 1720 a a a...

Страница 10: ...SEE NOTE 4 N No ot te es s 1 All dimensions are in inches 0 5 inch See Table 1 p 6 through Table 5 p 13 for dimension tables 2 UAFD brackets and supports shown are bolt on and removable Most brackets...

Страница 11: ...ble See Table 5 p 13 for application dimensions 3 Applies only to CVHE 190 320 NTON on 032 shells with free cooling option 4 Add 1 5 inch for distance to Tracer Adaptiview display mounting arm in stow...

Страница 12: ...N A 5000 a N A a N A 5800 a N A 123 4 N A 870 1300 440E a a a a 5000 a a a a 5800 a a 123 4 123 7 Table 4 Motor terminal boxes for CVHE CVHF and CVHG CenTraVac chillers continued Shell Size Comp Size...

Страница 13: ...5 69 3 75 9 050 080 480 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 500 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 565 440E 96 2 103 0 54 09 60 85 5000 97 7 104 3 55 59 62 19 080 142 7...

Страница 14: ...1 9 52 4 93 8 2250 2 Comp 2500 120 9 0 5 121 6 73 2 94 2 59 7 120 6 116 4 54 5 79 7 76 9 56 8 94 6 CDHF 3000 2 Comp 250M 120 9 0 5 121 6 76 3 92 3 63 1 120 6 116 4 54 5 84 3 76 9 56 8 96 8 3500 2 Comp...

Страница 15: ...7 1 3 092 1100 440E 6 8 11 8 13 1 3 1 5000 6 8 11 8 11 6 1 6 5800 6 8 11 8 9 8 0 2 2500 130 440E 3 6 0 5 21 1 11 1 5000 3 6 2 0 19 6 9 6 5800 3 6 3 8 17 8 7 8 092 110 440E 3 6 5 5 21 1 11 1 5000 3 6 7...

Страница 16: ...PORTS CAN BE UNBOLTED FROM BRACKETS AFD CONTROL PANEL Y2 UATR UPIR UXL STARTERS Y3 MOTOR TERMINAL BOX NOT SHOWN Y1 USTR USID STARTERS CONTROL PANEL K X Z W 1 0 90D 1210A AFD AFD DISCONNECT SWITCH TO E...

Страница 17: ...TS ARE WELDED TO EVAPORATOR ON 900 1210A AFD SUPPORTS CAN BE UNBOLTED FROM BRACKETS LARGEST MOTOR MOTOR S SPACE REMOVAL T MAX OD LARGEST MOTOR CHILLER DIMENSIONS INCHES F C CDHF UNIT SHOWN COOLING ONL...

Страница 18: ...d 10 a Heaviest motor used does not include the weight of the suction elbow b For Duplex chillers weights shown are for individual components multiply by two for total component weights for Duplex chi...

Страница 19: ...g 5190 f 250M 2500 28679 13008 10954 f 4969 f 29817 13524 11442 f 5190 f 250X 2500 31902 14470 10954 f 4969 f 33486 15188 11442 f 5190 f Note All weights are nominal and 10 a Bundle weights are for th...

Страница 20: ...units ship with a 5 psig 34 5 kPag dry nitrogen holding charge at nominal 72 F 22 C I Im mp po or rt ta an nt t New units that have been factory run tested contain residual refrigerant vent discharge...

Страница 21: ...t te e d di is sc co on nn ne ec ct ts s a an nd d d di is sc ch ha ar rg ge e a al ll l m mo ot to or r s st ta ar rt t r ru un n c ca ap pa ac ci it to or rs s b be ef fo or re e s se er rv vi ic ci...

Страница 22: ...t ta al ll le ed d a an nd d i it t i is s n ne ec ce es ss sa ar ry y t to o i in ns st ta al ll l d do ow we el li in ng g c co on nt ta ac ct t t th he e l lo oc ca al l T Tr ra an ne e S Se er rv...

Страница 23: ...at te e f fo or r r re ef fr ri ig ge er ra an nt t t ty yp pe e D Do o n no ot t u us se e n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt ts s r re ef fr ri ig ge er ra an nt t s...

Страница 24: ...l ly y f fo or r r re em mo ov vi in ng g w wa at te er rb bo ox x f fr ro om m c ch hi il ll le er r 6 Remove the suction elbow There are two styles of suction elbows a 90 elbow and a three piece elb...

Страница 25: ...i ic ch h c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y o or r e eq qu ui ip pm me en nt t d da am ma ag ge e S Sy ys st te em m c co on nt...

Страница 26: ...essor 11 Use the reverse order to reassemble the economizer on the chiller Be sure to install new gaskets at the appropriate joints 12 Torque all bolts to specifications Consult with your Trane servic...

Страница 27: ...er r N NF FP PA A 7 70 0E E t th ha at t a al ll l c ca ap pa ac ci it to or rs s h ha av ve e d di is sc ch ha ar rg ge ed d F Fo or r a ad dd di it ti io on na al l i in nf fo or rm ma at ti io on...

Страница 28: ...ie es s o on ne e a at t a a t ti im me e 5 Loosen the bolts which hold the starter to the flange on the motor Steady the starter panel as the retaining bolts are removed because the panel will tip fo...

Страница 29: ...ge er ra an nt t s su ub bs st ti it tu ut te es s o or r n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt t a ad dd di it ti iv ve es s W WA AR RN NI IN NG G H He ea av vy y O Ob b...

Страница 30: ...sed for removing the suction elbow Do not lift the piping simply support it to avoid slipping as the bolts are removed from the connecting flanges Typical rigging for lifting the suction elbow can be...

Страница 31: ...ot and discharge flange connections Before tightening any of these bolts reinstall the dowel pins in the compressor foot and discharge flange 4 Tighten the compressor foot and discharge flange bolts S...

Страница 32: ...ba ac ck k t to o a at tm mo os sp ph he er ri ic c p pr re es ss su ur re e b be ef fo or re e o op pe en ni in ng g s sy ys st te em m f fo or r r re ep pa ai ir rs s M Mi ix xt tu ur re es s o of f...

Страница 33: ...CVHE CVHF CVHG Water Cooled CenTraVac Chillers with Tracer AdaptiView Control and CDHF SVX01 EN Installation Operation and Maintenance CDHF and CDHG Water Cooled CenTraVac Chillers with Tracer Adapti...

Страница 34: ...34 CVHE SVN04M EN N No ot te es s...

Страница 35: ...CVHE SVN04M EN 35 N No ot te es s...

Страница 36: ...protect food and perishables and increase industrial productivity and efficiency We are a global business committed to a world of sustainable progress and enduring results ingersollrand com Ingersoll...

Отзывы: