background image

CVHE-SVN04M-EN

3

W

WA

AR

RN

NIIN

NG

G

F

Fo

ollllo

ow

w E

EH

HS

S P

Po

olliicciie

ess!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y..

••

A

Allll IIn

ng

ge

errsso

ollll R

Ra

an

nd

d p

pe

errsso

on

nn

ne

ell m

mu

usstt ffo

ollllo

ow

w

IIn

ng

ge

errsso

ollll R

Ra

an

nd

d E

En

nv

viirro

on

nm

me

en

ntta

all,, H

He

ea

alltth

h a

an

nd

d

S

Sa

affe

etty

y ((E

EH

HS

S)) p

po

olliicciie

ess w

wh

he

en

n p

pe

errffo

orrm

miin

ng

g w

wo

orrkk

ssu

ucch

h a

ass h

ho

ott w

wo

orrkk,, e

elle

eccttrriicca

all,, ffa

allll p

prro

otte

eccttiio

on

n,,

llo

occkko

ou

utt//tta

ag

go

ou

utt,, rre

effrriig

ge

erra

an

ntt h

ha

an

nd

dlliin

ng

g,, e

ettcc.. A

Allll

p

po

olliicciie

ess cca

an

n b

be

e ffo

ou

un

nd

d o

on

n tth

he

e

B

BO

OS

S ssiitte

e

.. W

Wh

he

erre

e

llo

occa

all rre

eg

gu

ulla

attiio

on

nss a

arre

e m

mo

orre

e ssttrriin

ng

ge

en

ntt tth

ha

an

n

tth

he

esse

e p

po

olliicciie

ess,, tth

ho

osse

e rre

eg

gu

ulla

attiio

on

nss ssu

up

pe

errsse

ed

de

e

tth

he

esse

e p

po

olliicciie

ess..

••

N

No

on

n--IIn

ng

ge

errsso

ollll R

Ra

an

nd

d p

pe

errsso

on

nn

ne

ell ssh

ho

ou

ulld

d a

allw

wa

ay

yss

ffo

ollllo

ow

w llo

occa

all rre

eg

gu

ulla

attiio

on

nss..

Copyright

This document and the information in it are the
property of Trane, and may not be used or reproduced
in whole or in part without written permission. Trane
reserves the right to revise this publication at any time,
and to make changes to its content without obligation
to notify any person of such revision or change.

Trademarks

All trademarks referenced in this document are the
trademarks of their respective owners.

Revision History

Update to

Figure 1, p. 10

Update to

Figure 2, p. 11

Factory Warranty Information

Compliance with the following is required to preserve
the factory warranty:

A

Allll U

Un

niitt IIn

nsstta

alllla

attiio

on

nss

Startup MUST be performed by Trane, or an authorized
agent of Trane, to VALIDATE this WARRANTY.
Contractor must provide a two-week startup
notification to Trane (or an agent of Trane specifically
authorized to perform startup).

A

Ad

dd

diittiio

on

na

all R

Re

eq

qu

uiirre

em

me

en

nttss ffo

orr U

Un

niittss R

Re

eq

qu

uiirriin

ng

g

D

Diissa

asssse

em

mb

blly

y a

an

nd

d R

Re

ea

asssse

em

mb

blly

y

When a new chiller is shipped and received from our
Trane manufacturing location and, for any reason, it
requires disassembly or partial disassembly, and
reassembly— which could include but is not limited to
the evaporator, condenser, control panel, compressor/
motor, economizer, purge, factory-mounted starter or
any other components originally attached to the fully
assembled unit— compliance with the following is
required to preserve the factory warranty:

Trane, or an agent of Trane specifically authorized
to perform start-up and warranty of Trane

®

products, will perform or have direct on-site
technical supervision of the disassembly and
reassembly work.

The installing contractor must notify Trane—or an
agent of Trane specifically authorized to perform
startup and warranty of Trane

®

products—two

weeks in advance of the scheduled disassembly
work to coordinate the disassembly and
reassembly work.

Start-up must be performed by Trane or an agent of
Trane specifically authorized to perform startup and
warranty of Trane

®

products.

Trane, or an agent of Trane specifically authorized to
perform start-up and warranty of Trane

®

products, will

provide qualified personnel and standard hand tools to
perform the disassembly and reassembly work at a
location specified by the contractor. The contractor
shall provide the rigging equipment such as chain falls,
gantries, cranes, forklifts, etc. necessary for the
disassembly and reassembly work and the required
qualified personnel to operate the necessary rigging
equipment.

IIn

nttrro

od

du

uccttiio

on

n

Содержание CenTraVac CDHF

Страница 1: ...knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the...

Страница 2: ...th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y T Te ec ch hn ni ic ci ia an...

Страница 3: ...11 Factory Warranty Information Compliance with the following is required to preserve the factory warranty A Al ll l U Un ni it t I In ns st ta al ll la at ti io on ns s Startup MUST be performed by...

Страница 4: ...ta an nt t These procedures do NOT apply to units that have been installed and electrical supply wiring has been completed Contractor Responsibilities W WA AR RN NI IN NG G H He ea av vy y O Ob bj je...

Страница 5: ...pass INDP Optional industrial control package SMP Optional supplemental motor protection INDP units only UAFD Unit mounted Adaptive Frequency drive UATR Unit mounted medium voltage auto transformer UP...

Страница 6: ...42 0 78 3 51 3 59 1 93 8 45 5 62 2 63 5 44 3 620 870 080 870 93 5 75 0 101 3 42 0 81 2 59 7 73 2 93 8 45 5 63 9 63 5 44 3 080 142 870 101 3 79 4 107 5 a 81 3 59 7 73 2 102 0 45 5 67 9 63 59 46 0 142...

Страница 7: ...102 0 45 5 64 3 63 59 46 0 142 920 98 1 84 0 111 0 a 93 2 54 3 68 0 105 5 46 9 69 8 62 5 46 0 142 210 920 106 0 89 7 109 7 a 93 3 54 6 68 7 105 4 46 9 76 2 62 5 52 4 210 920 106 5 96 0 116 0 a 93 2 54...

Страница 8: ...21 1 36 8 126 9 129 0 N A N A 72 7 210 1300 93 8 76 4 86 9 N A 21 1 36 8 124 7 135 2 87 2 87 2 82 4 250 1300 97 9 80 4 90 9 N A 18 6 36 8 137 2 139 4 N A N A 82 7 1470 1720 142 210 1720 86 5 72 8 83 3...

Страница 9: ...9 77 5 N A 146 0 91 0 4 6 142 210 1300 a a a a 147 9 83 6 3 5 154 9 90 6 5 6 210 1300 a a a a N A N A N A 152 4 95 9 3 9 250 1300 140 7 b 80 2 a N A N A N A 160 0 99 5 3 1 1470 1720 142 210 1720 a a a...

Страница 10: ...SEE NOTE 4 N No ot te es s 1 All dimensions are in inches 0 5 inch See Table 1 p 6 through Table 5 p 13 for dimension tables 2 UAFD brackets and supports shown are bolt on and removable Most brackets...

Страница 11: ...ble See Table 5 p 13 for application dimensions 3 Applies only to CVHE 190 320 NTON on 032 shells with free cooling option 4 Add 1 5 inch for distance to Tracer Adaptiview display mounting arm in stow...

Страница 12: ...N A 5000 a N A a N A 5800 a N A 123 4 N A 870 1300 440E a a a a 5000 a a a a 5800 a a 123 4 123 7 Table 4 Motor terminal boxes for CVHE CVHF and CVHG CenTraVac chillers continued Shell Size Comp Size...

Страница 13: ...5 69 3 75 9 050 080 480 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 500 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 565 440E 96 2 103 0 54 09 60 85 5000 97 7 104 3 55 59 62 19 080 142 7...

Страница 14: ...1 9 52 4 93 8 2250 2 Comp 2500 120 9 0 5 121 6 73 2 94 2 59 7 120 6 116 4 54 5 79 7 76 9 56 8 94 6 CDHF 3000 2 Comp 250M 120 9 0 5 121 6 76 3 92 3 63 1 120 6 116 4 54 5 84 3 76 9 56 8 96 8 3500 2 Comp...

Страница 15: ...7 1 3 092 1100 440E 6 8 11 8 13 1 3 1 5000 6 8 11 8 11 6 1 6 5800 6 8 11 8 9 8 0 2 2500 130 440E 3 6 0 5 21 1 11 1 5000 3 6 2 0 19 6 9 6 5800 3 6 3 8 17 8 7 8 092 110 440E 3 6 5 5 21 1 11 1 5000 3 6 7...

Страница 16: ...PORTS CAN BE UNBOLTED FROM BRACKETS AFD CONTROL PANEL Y2 UATR UPIR UXL STARTERS Y3 MOTOR TERMINAL BOX NOT SHOWN Y1 USTR USID STARTERS CONTROL PANEL K X Z W 1 0 90D 1210A AFD AFD DISCONNECT SWITCH TO E...

Страница 17: ...TS ARE WELDED TO EVAPORATOR ON 900 1210A AFD SUPPORTS CAN BE UNBOLTED FROM BRACKETS LARGEST MOTOR MOTOR S SPACE REMOVAL T MAX OD LARGEST MOTOR CHILLER DIMENSIONS INCHES F C CDHF UNIT SHOWN COOLING ONL...

Страница 18: ...d 10 a Heaviest motor used does not include the weight of the suction elbow b For Duplex chillers weights shown are for individual components multiply by two for total component weights for Duplex chi...

Страница 19: ...g 5190 f 250M 2500 28679 13008 10954 f 4969 f 29817 13524 11442 f 5190 f 250X 2500 31902 14470 10954 f 4969 f 33486 15188 11442 f 5190 f Note All weights are nominal and 10 a Bundle weights are for th...

Страница 20: ...units ship with a 5 psig 34 5 kPag dry nitrogen holding charge at nominal 72 F 22 C I Im mp po or rt ta an nt t New units that have been factory run tested contain residual refrigerant vent discharge...

Страница 21: ...t te e d di is sc co on nn ne ec ct ts s a an nd d d di is sc ch ha ar rg ge e a al ll l m mo ot to or r s st ta ar rt t r ru un n c ca ap pa ac ci it to or rs s b be ef fo or re e s se er rv vi ic ci...

Страница 22: ...t ta al ll le ed d a an nd d i it t i is s n ne ec ce es ss sa ar ry y t to o i in ns st ta al ll l d do ow we el li in ng g c co on nt ta ac ct t t th he e l lo oc ca al l T Tr ra an ne e S Se er rv...

Страница 23: ...at te e f fo or r r re ef fr ri ig ge er ra an nt t t ty yp pe e D Do o n no ot t u us se e n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt ts s r re ef fr ri ig ge er ra an nt t s...

Страница 24: ...l ly y f fo or r r re em mo ov vi in ng g w wa at te er rb bo ox x f fr ro om m c ch hi il ll le er r 6 Remove the suction elbow There are two styles of suction elbows a 90 elbow and a three piece elb...

Страница 25: ...i ic ch h c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y o or r e eq qu ui ip pm me en nt t d da am ma ag ge e S Sy ys st te em m c co on nt...

Страница 26: ...essor 11 Use the reverse order to reassemble the economizer on the chiller Be sure to install new gaskets at the appropriate joints 12 Torque all bolts to specifications Consult with your Trane servic...

Страница 27: ...er r N NF FP PA A 7 70 0E E t th ha at t a al ll l c ca ap pa ac ci it to or rs s h ha av ve e d di is sc ch ha ar rg ge ed d F Fo or r a ad dd di it ti io on na al l i in nf fo or rm ma at ti io on...

Страница 28: ...ie es s o on ne e a at t a a t ti im me e 5 Loosen the bolts which hold the starter to the flange on the motor Steady the starter panel as the retaining bolts are removed because the panel will tip fo...

Страница 29: ...ge er ra an nt t s su ub bs st ti it tu ut te es s o or r n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt t a ad dd di it ti iv ve es s W WA AR RN NI IN NG G H He ea av vy y O Ob b...

Страница 30: ...sed for removing the suction elbow Do not lift the piping simply support it to avoid slipping as the bolts are removed from the connecting flanges Typical rigging for lifting the suction elbow can be...

Страница 31: ...ot and discharge flange connections Before tightening any of these bolts reinstall the dowel pins in the compressor foot and discharge flange 4 Tighten the compressor foot and discharge flange bolts S...

Страница 32: ...ba ac ck k t to o a at tm mo os sp ph he er ri ic c p pr re es ss su ur re e b be ef fo or re e o op pe en ni in ng g s sy ys st te em m f fo or r r re ep pa ai ir rs s M Mi ix xt tu ur re es s o of f...

Страница 33: ...CVHE CVHF CVHG Water Cooled CenTraVac Chillers with Tracer AdaptiView Control and CDHF SVX01 EN Installation Operation and Maintenance CDHF and CDHG Water Cooled CenTraVac Chillers with Tracer Adapti...

Страница 34: ...34 CVHE SVN04M EN N No ot te es s...

Страница 35: ...CVHE SVN04M EN 35 N No ot te es s...

Страница 36: ...protect food and perishables and increase industrial productivity and efficiency We are a global business committed to a world of sustainable progress and enduring results ingersollrand com Ingersoll...

Отзывы: