Trane CenTraVac CDHF Скачать руководство пользователя страница 29

CVHE-SVN04M-EN

29

Figure 21.

Separable shell unit (end view)

3. Remove the bolts from the flanges connecting the

evaporator tube sheet and condenser shell support
(see

Figure 22, p. 29

). Then remove the bolts from

the flanges connecting the shells.

N

No

otte

e:: Some small shell combinations do not have

flanged connections between shells.

4. Remove the two dowel pins located in the flange on

each end of the shell tube sheet connections and lift
the condenser clear of the evaporator.

5. Reassemble the evaporator and condenser shells in

the reverse order.

6. Torque all bolts to specifications listed in

Table 13,

p. 32

.

Figure 22.

Separable shell unit (flange connection)

Disassembly of Chillers with
Options

Heat Recovery

Use the following steps when disassembling chillers
with auxiliary or heat recovery condenser shells to
reduce the vertical clearance required for the chiller
installation.

W

WA

AR

RN

NIIN

NG

G

R

Re

effrriig

ge

erra

an

ntt M

Ma

ay

y B

Be

e U

Un

nd

de

err P

Po

ossiittiiv

ve

e

P

Prre

essssu

urre

e!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

a

an

n e

ex

xp

pllo

ossiio

on

n w

wh

hiicch

h cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y o

orr e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e..

S

Sy

ysstte

em

m cco

on

ntta

aiin

nss rre

effrriig

ge

erra

an

ntt a

an

nd

d m

ma

ay

y b

be

e u

un

nd

de

err

p

po

ossiittiiv

ve

e p

prre

essssu

urre

e;; ssy

ysstte

em

m m

ma

ay

y a

allsso

o cco

on

ntta

aiin

n o

oiill..

R

Re

ecco

ov

ve

err rre

effrriig

ge

erra

an

ntt tto

o rre

elliie

ev

ve

e p

prre

essssu

urre

e b

be

effo

orre

e

o

op

pe

en

niin

ng

g tth

he

e ssy

ysstte

em

m.. S

Se

ee

e u

un

niitt n

na

am

me

ep

plla

atte

e ffo

orr

rre

effrriig

ge

erra

an

ntt tty

yp

pe

e.. D

Do

o n

no

ott u

usse

e n

no

on

n--a

ap

pp

prro

ov

ve

ed

d

rre

effrriig

ge

erra

an

nttss,, rre

effrriig

ge

erra

an

ntt ssu

ub

bssttiittu

utte

ess,, o

orr n

no

on

n--

a

ap

pp

prro

ov

ve

ed

d rre

effrriig

ge

erra

an

ntt a

ad

dd

diittiiv

ve

ess..

W

WA

AR

RN

NIIN

NG

G

H

He

ea

av

vy

y O

Ob

bjje

ecctt!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

u

un

niitt d

drro

op

pp

piin

ng

g w

wh

hiicch

h cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y,, a

an

nd

d e

eq

qu

uiip

pm

me

en

ntt o

orr p

prro

op

pe

errtty

y--o

on

nlly

y

d

da

am

ma

ag

ge

e..

E

En

nssu

urre

e tth

ha

att a

allll tth

he

e lliiffttiin

ng

g e

eq

qu

uiip

pm

me

en

ntt u

usse

ed

d iiss

p

prro

op

pe

errlly

y rra

atte

ed

d ffo

orr tth

he

e w

we

eiig

gh

htt o

off tth

he

e u

un

niitt b

be

eiin

ng

g

lliifftte

ed

d.. E

Ea

acch

h o

off tth

he

e cca

ab

blle

ess ((cch

ha

aiin

nss o

orr sslliin

ng

gss)),, h

ho

oo

okkss,,

a

an

nd

d ssh

ha

acckklle

ess u

usse

ed

d tto

o lliifftt tth

he

e u

un

niitt m

mu

usstt b

be

e cca

ap

pa

ab

blle

e

o

off ssu

up

pp

po

orrttiin

ng

g tth

he

e e

en

nttiirre

e w

we

eiig

gh

htt o

off tth

he

e u

un

niitt.. L

Liiffttiin

ng

g

cca

ab

blle

ess ((cch

ha

aiin

nss o

orr sslliin

ng

gss)) m

ma

ay

y n

no

ott b

be

e o

off tth

he

e ssa

am

me

e

lle

en

ng

gtth

h.. A

Ad

djju

usstt a

ass n

ne

ecce

essssa

arry

y ffo

orr e

ev

ve

en

n u

un

niitt lliifftt..

1. Support the auxiliary or heat recovery condenser

with rigging using the lifting holes on the tube
sheets. Do not lift the shell; simply support it to
avoid slipping as the bolts are removed from the
connecting flanges.

2. Remove the bolts from the flanges on the

interconnecting piping and flanges connecting the
auxiliary heat recovery condenser and condenser
tube sheets.

3. Remove the bolts from the flanges on the

interconnecting piping and the flanges connecting
the shells.

4. Lift the condenser clear of the unit.

5. Reassemble the condenser in the reverse order.

Install new gaskets at the appropriate joints.

6. Torque all bolts to torque specifications listed in

Table 13, p. 32

.

D

Diissa

asssse

em

mb

blly

y

Содержание CenTraVac CDHF

Страница 1: ...knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the...

Страница 2: ...th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y T Te ec ch hn ni ic ci ia an...

Страница 3: ...11 Factory Warranty Information Compliance with the following is required to preserve the factory warranty A Al ll l U Un ni it t I In ns st ta al ll la at ti io on ns s Startup MUST be performed by...

Страница 4: ...ta an nt t These procedures do NOT apply to units that have been installed and electrical supply wiring has been completed Contractor Responsibilities W WA AR RN NI IN NG G H He ea av vy y O Ob bj je...

Страница 5: ...pass INDP Optional industrial control package SMP Optional supplemental motor protection INDP units only UAFD Unit mounted Adaptive Frequency drive UATR Unit mounted medium voltage auto transformer UP...

Страница 6: ...42 0 78 3 51 3 59 1 93 8 45 5 62 2 63 5 44 3 620 870 080 870 93 5 75 0 101 3 42 0 81 2 59 7 73 2 93 8 45 5 63 9 63 5 44 3 080 142 870 101 3 79 4 107 5 a 81 3 59 7 73 2 102 0 45 5 67 9 63 59 46 0 142...

Страница 7: ...102 0 45 5 64 3 63 59 46 0 142 920 98 1 84 0 111 0 a 93 2 54 3 68 0 105 5 46 9 69 8 62 5 46 0 142 210 920 106 0 89 7 109 7 a 93 3 54 6 68 7 105 4 46 9 76 2 62 5 52 4 210 920 106 5 96 0 116 0 a 93 2 54...

Страница 8: ...21 1 36 8 126 9 129 0 N A N A 72 7 210 1300 93 8 76 4 86 9 N A 21 1 36 8 124 7 135 2 87 2 87 2 82 4 250 1300 97 9 80 4 90 9 N A 18 6 36 8 137 2 139 4 N A N A 82 7 1470 1720 142 210 1720 86 5 72 8 83 3...

Страница 9: ...9 77 5 N A 146 0 91 0 4 6 142 210 1300 a a a a 147 9 83 6 3 5 154 9 90 6 5 6 210 1300 a a a a N A N A N A 152 4 95 9 3 9 250 1300 140 7 b 80 2 a N A N A N A 160 0 99 5 3 1 1470 1720 142 210 1720 a a a...

Страница 10: ...SEE NOTE 4 N No ot te es s 1 All dimensions are in inches 0 5 inch See Table 1 p 6 through Table 5 p 13 for dimension tables 2 UAFD brackets and supports shown are bolt on and removable Most brackets...

Страница 11: ...ble See Table 5 p 13 for application dimensions 3 Applies only to CVHE 190 320 NTON on 032 shells with free cooling option 4 Add 1 5 inch for distance to Tracer Adaptiview display mounting arm in stow...

Страница 12: ...N A 5000 a N A a N A 5800 a N A 123 4 N A 870 1300 440E a a a a 5000 a a a a 5800 a a 123 4 123 7 Table 4 Motor terminal boxes for CVHE CVHF and CVHG CenTraVac chillers continued Shell Size Comp Size...

Страница 13: ...5 69 3 75 9 050 080 480 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 500 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 565 440E 96 2 103 0 54 09 60 85 5000 97 7 104 3 55 59 62 19 080 142 7...

Страница 14: ...1 9 52 4 93 8 2250 2 Comp 2500 120 9 0 5 121 6 73 2 94 2 59 7 120 6 116 4 54 5 79 7 76 9 56 8 94 6 CDHF 3000 2 Comp 250M 120 9 0 5 121 6 76 3 92 3 63 1 120 6 116 4 54 5 84 3 76 9 56 8 96 8 3500 2 Comp...

Страница 15: ...7 1 3 092 1100 440E 6 8 11 8 13 1 3 1 5000 6 8 11 8 11 6 1 6 5800 6 8 11 8 9 8 0 2 2500 130 440E 3 6 0 5 21 1 11 1 5000 3 6 2 0 19 6 9 6 5800 3 6 3 8 17 8 7 8 092 110 440E 3 6 5 5 21 1 11 1 5000 3 6 7...

Страница 16: ...PORTS CAN BE UNBOLTED FROM BRACKETS AFD CONTROL PANEL Y2 UATR UPIR UXL STARTERS Y3 MOTOR TERMINAL BOX NOT SHOWN Y1 USTR USID STARTERS CONTROL PANEL K X Z W 1 0 90D 1210A AFD AFD DISCONNECT SWITCH TO E...

Страница 17: ...TS ARE WELDED TO EVAPORATOR ON 900 1210A AFD SUPPORTS CAN BE UNBOLTED FROM BRACKETS LARGEST MOTOR MOTOR S SPACE REMOVAL T MAX OD LARGEST MOTOR CHILLER DIMENSIONS INCHES F C CDHF UNIT SHOWN COOLING ONL...

Страница 18: ...d 10 a Heaviest motor used does not include the weight of the suction elbow b For Duplex chillers weights shown are for individual components multiply by two for total component weights for Duplex chi...

Страница 19: ...g 5190 f 250M 2500 28679 13008 10954 f 4969 f 29817 13524 11442 f 5190 f 250X 2500 31902 14470 10954 f 4969 f 33486 15188 11442 f 5190 f Note All weights are nominal and 10 a Bundle weights are for th...

Страница 20: ...units ship with a 5 psig 34 5 kPag dry nitrogen holding charge at nominal 72 F 22 C I Im mp po or rt ta an nt t New units that have been factory run tested contain residual refrigerant vent discharge...

Страница 21: ...t te e d di is sc co on nn ne ec ct ts s a an nd d d di is sc ch ha ar rg ge e a al ll l m mo ot to or r s st ta ar rt t r ru un n c ca ap pa ac ci it to or rs s b be ef fo or re e s se er rv vi ic ci...

Страница 22: ...t ta al ll le ed d a an nd d i it t i is s n ne ec ce es ss sa ar ry y t to o i in ns st ta al ll l d do ow we el li in ng g c co on nt ta ac ct t t th he e l lo oc ca al l T Tr ra an ne e S Se er rv...

Страница 23: ...at te e f fo or r r re ef fr ri ig ge er ra an nt t t ty yp pe e D Do o n no ot t u us se e n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt ts s r re ef fr ri ig ge er ra an nt t s...

Страница 24: ...l ly y f fo or r r re em mo ov vi in ng g w wa at te er rb bo ox x f fr ro om m c ch hi il ll le er r 6 Remove the suction elbow There are two styles of suction elbows a 90 elbow and a three piece elb...

Страница 25: ...i ic ch h c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y o or r e eq qu ui ip pm me en nt t d da am ma ag ge e S Sy ys st te em m c co on nt...

Страница 26: ...essor 11 Use the reverse order to reassemble the economizer on the chiller Be sure to install new gaskets at the appropriate joints 12 Torque all bolts to specifications Consult with your Trane servic...

Страница 27: ...er r N NF FP PA A 7 70 0E E t th ha at t a al ll l c ca ap pa ac ci it to or rs s h ha av ve e d di is sc ch ha ar rg ge ed d F Fo or r a ad dd di it ti io on na al l i in nf fo or rm ma at ti io on...

Страница 28: ...ie es s o on ne e a at t a a t ti im me e 5 Loosen the bolts which hold the starter to the flange on the motor Steady the starter panel as the retaining bolts are removed because the panel will tip fo...

Страница 29: ...ge er ra an nt t s su ub bs st ti it tu ut te es s o or r n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt t a ad dd di it ti iv ve es s W WA AR RN NI IN NG G H He ea av vy y O Ob b...

Страница 30: ...sed for removing the suction elbow Do not lift the piping simply support it to avoid slipping as the bolts are removed from the connecting flanges Typical rigging for lifting the suction elbow can be...

Страница 31: ...ot and discharge flange connections Before tightening any of these bolts reinstall the dowel pins in the compressor foot and discharge flange 4 Tighten the compressor foot and discharge flange bolts S...

Страница 32: ...ba ac ck k t to o a at tm mo os sp ph he er ri ic c p pr re es ss su ur re e b be ef fo or re e o op pe en ni in ng g s sy ys st te em m f fo or r r re ep pa ai ir rs s M Mi ix xt tu ur re es s o of f...

Страница 33: ...CVHE CVHF CVHG Water Cooled CenTraVac Chillers with Tracer AdaptiView Control and CDHF SVX01 EN Installation Operation and Maintenance CDHF and CDHG Water Cooled CenTraVac Chillers with Tracer Adapti...

Страница 34: ...34 CVHE SVN04M EN N No ot te es s...

Страница 35: ...CVHE SVN04M EN 35 N No ot te es s...

Страница 36: ...protect food and perishables and increase industrial productivity and efficiency We are a global business committed to a world of sustainable progress and enduring results ingersollrand com Ingersoll...

Отзывы: