![Trane Ascend ACR Series Скачать руководство пользователя страница 65](http://html1.mh-extra.com/html/trane/ascend-acr-series/ascend-acr-series_installation-operation-and-maintenance-manual_1149620065.webp)
AC-SVX001A-EN
65
Pre-Start
Upon completion of installation, complete the
Installation Completion Check Sheet and Request for
Trane Service checklist in Log and Check Sheet
chapter.
IIm
mp
po
orrtta
an
ntt:: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane
products. Contractor shall provide Trane
(or an agent of Trane specifically
authorized to perform start-up) with notice
of the scheduled start-up at least two weeks
prior to the scheduled start-up.
Содержание Ascend ACR Series
Страница 110: ...110 AC SVX001A EN N No ot te es s...
Страница 111: ...AC SVX001A EN 111 N No ot te es s...