16
AC-SVX001A-EN
Installation Requirements
Type
Trane Supplied
Trane Installed
Trane Supplied
Field Installed
Field Supplied
Field Installed
Foundation
• Meet foundation requirements
Rigging
• Safety chains
• Clevis connectors
• Lifting beam
• Spreader bar
Disassembly/Reassembly
(as required)
Trane, or an agent of Trane
specifically authorized to
perform start-up of Trane®
products (contact your local
Trane office for pricing)
Isolation
Elastomeric isolators
(optional)
• Elastomeric isolators (optional)
Electrical
• Circuit breakers (optional)
• Unit Mounted Starter
• Circuit breakers (optional)
• Electrical connections to unit mounted starter
• Wiring sizes per submittal and NEC
• Terminal lugs
• Ground connection(s)
• BAS wiring (optional)
• Control voltage wiring
• Chilled water pump contactor and wiring
• Option relays and wiring
Water piping
Flow switch
• Taps for thermometers and gauges
• Thermometers
• Water flow pressure gauges
• Isolation and balancing valves in water piping
• Vents and drain
• Waterside pressure relief valves
• Water strainer
Insulation
Insulation
Insulation
Water Piping Connection
Components
Grooved pipe
Flange kit (optional)
Other Materials
• R-134a refrigerant
• Dry nitrogen (optional)
Ascend™ Model ACR
Installation Completion Check
Sheet and Request for Trane
Service
(AC-ADF001*-EN)
See Log and Check Sheet
chapter
Chiller Start-up
Commissioning
Trane, or an agent of Trane
specifically authorized to
perform start-up of Trane®
products
Trane specifically authorized
to perform start-up of Trane®
products