RT-SVX060A-GB
17
11
UNT-PRC002-GB
Sound power levels
Discharge
Measurement conditions:
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
long) fixed to its discharge opening.
Fan
Power level in dB(A), per Hz frequency band
Overall power
Unit
speed
125
250
500
1000
2000
4000
8000
dB(A)
1
55
50
42
37
37
31
30
46
FWD 08
2
57
54
47
40
30
38
40
50
3
58
57
50
42
32
40
43
53
1
57
51
45
42
34
33
28
48
FWD 10
2
58
54
48
45
38
39
35
51
3
60
58
50
48
40
42
39
54
1
57
51
45
42
34
33
28
48
FWD 12
2
58
54
48
45
38
39
35
51
3
60
58
50
48
40
42
39
54
1
56
62
50
48
39
38
36
56
FWD 14
2
61
66
55
53
47
46
45
60
3
63
69
58
56
50
50
49
63
1
57
63
51
49
40
39
37
57
FWD 20
2
61
66
55
53
47
46
45
60
3
63
69
58
56
50
50
49
63
Intake
Measurement conditions:
Measurements taken at the horizontal air intake.
Fan
Power level in dB(A), per Hz frequency band
Overall power
Unit
speed
125
250
500
1000
2000
4000
8000
dB(A)
1
56
55
55
53
46
45
42
57
FWD 08
2
63
62
60
60
53
53
53
64
3
66
65
63
62
56
55
57
67
1
62
58
55
58
51
48
44
61
FWD 10
2
66
63
60
62
56
55
52
66
3
70
67
63
65
59
59
57
69
1
62
58
55
58
51
48
44
61
FWD 12
2
66
63
60
62
56
55
52
66
3
70
67
63
65
59
59
57
69
1
66
65
65
65
57
50
46
68
FWD 14
2
73
72
69
71
64
59
57
74
3
78
76
73
75
69
64
63
78
1
68
72
64
64
56
52
50
69
FWD 20
2
76
76
68
71
65
61
61
75
3
78
79
71
74
69
66
66
78
General information: The installation must conform to
all local standards and regulations.
Reception of Units
Unit Handling
The unit is supplied on wooden blocks. It is
recommended to check the machine’s condition upon
reception.
There are two ways to handle the unit:
1) Handle the machine using a forklift, in accordance
with applicable safety regulations. Handling of the
unit is prohibited unless forks are longer than the
length of the unit.
2) Use a lifting beam correctly adjusted to fit the unit.
The units are supplied on the truck but are not
unloaded. A lifting lug is provided on each corner of the
unit’s base to facilitate handling. 4 shackles and 4 slings
are required.
Use a lifting beam to prevent the cables pressing too
hard on top of the unit during lifting.
Important:
For unit to fit on the roof curb the wooden
blocks must be removed.
Lifting and moving Instructions
It is recommended to use the special built-in rigging
points shown in the diagram and the following
instructions:
1 - Use the four rigging points which are built into the
unit.
2 - Slings and a spreader bar are to be provided by the
rigger.
3 - The minimum lifting capacity of each sling (with an
angle of 30° max) as the spreader bar must be equal
or higher than tabulated unit shipping weight.
4 - Caution : This unit must be lifted and handled with
care. Avoid shocks while handing.
Figure 2 - Lifting drawing
Roof Curb Installation
Roof curb option is not developed by Trane. However it
is possible to to use specific roof curb developed case by
case for down flow units. The roof curb should support
the unit and should ensure water tightness.
Installation